Obvius AcquiSuite Ally 12 Install Manual Download Page 13

 

Revision C (12/18) 

13 

 

Wiring the CTs to the 

AcquiSuite™ Ally

 Meter 

The  image  below  is  the  counterpart  to  the  service  panel  illustration  and  indicates  how  to 
connect CTs to the input terminals on the 

AcquiSuite™

 Ally, for each service type. For service 

types that are not 

specifically listed, it is recommended to choose “single phase” service and 

configure each channel individually. Three phase loads are illustrated on the left and split phase 
loads on the right as an example only. Elements are fully interchangeable on the meter.

 

 

 

Current and voltage inputs must be installed ‘in phase’ for accurate readings (e.g. CT1 

on Line 1, CT2 on Line 2) 

Orientation is critical:

 Ensure that all CTs are properly oriented 

with the line and load, as marked. Failure to install CTs in the correct orientation and on 
the correct phase will lead to inaccurate meter readings. 

 

 

Summary of Contents for AcquiSuite Ally 12

Page 1: ...Revision C 12 18 AcquiSuite Ally 12 48 Advanced Multi Circuit Meter Install Guide...

Page 2: ...for any consequences arising out of the use of this material DO NOT EXCEED 346V Line to Neutral or 600 volts Line to Line This meter is equipped to monitor loads up to 346V L N Exceeding this voltage...

Page 3: ...output 200 mA self resetting fuse Waveform Sampling 1 8 kHz Parameter Update Rate 1 second Measurements Volts Amps kW kVAR kVA aPF dPF kW demand kVA demand Import Received kWh Export Delivered kWh Net...

Page 4: ...perating System Windows 7 Windows 8 Windows 10 Communications Port USB or Ethernet connectivity Safety FCC Compliance This device has been tested and found to comply with the limits for a Class A digi...

Page 5: ...Revision C 12 18 5 Mechanical Specifications Mounting Series AMC48 Enclosure Series AMC12 Enclosure...

Page 6: ...Revision C 12 18 6 Series AMC48 Enclosure Drill Pattern Series AMC12 Enclosure Drill Pattern...

Page 7: ...Revision C 12 18 7 Series AMC48 Mounting Plate Template...

Page 8: ...nd drill wall mounting points 2x 6x customer supplied The plastic enclosure itself can be used as a template for marking the drill locations on the wall If the meter is not available for use as a dril...

Page 9: ...Revision C 12 18 9 STEP 3 Mount conduit fittings conduits and blanking plugs STEP 4 Connect voltage leads...

Page 10: ...t the voltage leads L1 L2 L3 and N as necessary to the meter through a dedicated disconnect or circuit breaker A voltage lead of 14 AWG THHN Minimum 600VAC rating or equivalent is required IMPORTANT V...

Page 11: ...EXAMPLE LOADS Single Phase L1 N or L2 N 110 VAC Lighting Appliance Living Zone Single Phase L1 L2 220 VAC Water Heater Clothes Dryer Equipment with no neutral wire Split Phase L1 L2 220 VAC Service E...

Page 12: ...wire to this terminal If the neutral terminal is left open L L measurements will be accurate but L N measurements may not be symmetric If a ground wire is connected to the Neutral terminal 2mA will fl...

Page 13: ...hase service and configure each channel individually Three phase loads are illustrated on the left and split phase loads on the right as an example only Elements are fully interchangeable on the meter...

Page 14: ...Revision C 12 18 14...

Page 15: ...Contrast entry in the documentation indicates the active menu item in a list which corresponds to a blinking character in the physical LCD The ENTER button is used to select a property and up down but...

Page 16: ...ing supports accumulation of consumption data from any external meter using a dry contact Form A Relay or open collector outputs The AcquiSuite Ally pulse inputs are compatible with low speed meters T...