
Revision C (12/18)
12
Wiring the
AcquiSuit
e™ Ally
Meter in a 4-wire, 3
ɸ
Service Panel
Illustrating the intended wiring configuration for each of the Service Types
available in the Service drop-
down list under “Meter Setup”
Note:
The
AcquiSuite
™
Ally
Meter Series uses the “Neutral” Terminal as a
voltage reference. For systems without a neutral conductor, Leviton
suggests connecting a ground wire to this terminal. If the neutral terminal
is left open, L-L measurements will be accurate, but L-N measurements
may not be symmetric. If a ground wire is connected to the Neutral
terminal, <2mA will flow into the ground wire.
Single Phase
Branch Loads
L1-N
Connect the
Neutral wire
or Ground wire to
V INPUT 1 (N) on
the meter
Meter Power
Connect all phases
to the V INPUT 1
terminal
(Label as
Disconnect
)
3-Wire, 3
ɸ
DELTA load
(No possibility of
Neutral Current)
L1-N,
L2-N(est)
, L3-N
3 Wire, 3
ɸ
used
On MAINS
L1-N, L2-N, L3-N
(
Rogowski Coils
Shown)
4 Wire, 3
ɸ
WYE load
(Neutral Current)
L1-N, L2-N, L3-N
Summary of Contents for AcquiSuite Ally 12
Page 1: ...Revision C 12 18 AcquiSuite Ally 12 48 Advanced Multi Circuit Meter Install Guide...
Page 6: ...Revision C 12 18 6 Series AMC48 Enclosure Drill Pattern Series AMC12 Enclosure Drill Pattern...
Page 7: ...Revision C 12 18 7 Series AMC48 Mounting Plate Template...
Page 14: ...Revision C 12 18 14...