![OBO Bettermann EÜK VK Series Mounting Instructions Download Page 30](http://html1.mh-extra.com/html/obo-bettermann/euk-vk-series/euk-vk-series_mounting-instructions_3177584030.webp)
Completing mounting
30 | EN
OBOBettermann
11.2
Decoupling the underfloor junction box/underfloor device
socket
Fig. 20:
Decouplingtheunderfloorjunctionbox/underfloordevicesocket
Note!
When laying the underfloor sockets in floating screed, heated screeds
or screeds on separating layers, the underfloor sockets must be decou-
pled. This improves noise protection and gives space to possible defor-
mations of the screed.
1. Releasethelocking(setmarkto"0").
2. Turnoutthescrewsorholdthescrewstightly,insertthequickun-
lockingaid
7
andremovethescrews.
3. Insertthe4locksandlockthem.
Optional: Decoupling after the floor covering work
Note!
The decoupling of the underfloor junction boxes/underfloor device sock-
ets can optionally take place after the laying of the floor covering.