![OBL MS-Plus Series Manual Download Page 17](http://html1.mh-extra.com/html/obl/ms-plus-series/ms-plus-series_manual_3213742017.webp)
TÀI LIỆU HD VẬN HÀNH BƠM ĐỊNH LƯỢNG TỪ TÍNH OBL - Ý
www.quangminhvn.com
Page 17
7.4
Putting into service after a dismantling
Đưa vào vận hành sau khi tháo rời
Whenever the pump is dismantled from the pipe-work, you will be well advised to replace the caps
on the connectors to avoid residual liquid being spilled. Before attaching the delivery hose to the
plant, prime the metering pump. Before finalizing the installation of the discharge hose, make sure
that the pump strokes will not cause it to move and bump into rigid bodies. In case of priming
difficulties, use a normal syringe to suck liquid from the discharge nipple while the pump is
operating, continue until you see the liquid rising in the syringe. Use a short length of suction hose
to connectthe syringe to the discharge nipple. In case of a pump equipped with an air bleed valve,
unscrew the air relief valve B until all the air in the pump head is out.
Try to keep both suction and discharge hoses as straight as possible, avoiding all unnecessary bends
Bất cứ khi nào tháo rời bơm khỏi hệ thống đường ống, nên thay thế nắp ở đầu dây nối để tránh
làm tràn chất lỏng còn dư. Trước khi đính kèm ống phân phối đến công trình, mồi bơm định
lượng. Trước khi hoàn thành lắp đặt ống phân phối, đảm bảo rằng chu kỳ của bơm sẽ không