Section 4: Installation
13
¼” Water Line With
Insulation Tubing
(Provided)
Solenoid Valve
Route the insulated cold water-out line up into the bottle filler cabinet and connect it to
the solenoid valve located in the alcove.
FOR UNFILTERED MODEL ONLY.
9.