background image

Quick-Connect Fittings 

If you need to cut the plastic tubing, be sure to cut tube ends square 
and straight.  Do not deform the tube (i.e., cause tube to compress its 
diameter so it is no longer round, or it may result in a water leak at the 
fitting).

Make sure the outer surface of the tube is clear of marks or scratches 
for a length equal to twice the tube diameter.  This allows the “O” ring 
to seat properly against the tube (See figure below).

Avoid sharp changes in direction when routing the tubing.  Sharp turns 
could cause the tubing to kink, which reduces its flow capacity and or 
stops it completely.

Fittings consist of two parts:  a body and a collet.  (See figure below).

To install a tube, push it through the collet until it seats firmly at the 
bottom of the fitting.

To remove a tube, push and hold the collet against the body while 
pulling the tube out.  Pushing the tube into the body before pushing the 
collet in will aid in the removal of the tube.

5. PROPER QUICK CONNECT FITTING CONNECTION  

5. PROPER QUICK CONNECT FITTING CONNECTION  

5. PROPER QUICK CONNECT FITTING CONNECTION  

5. PROPER QUICK CONNECT FITTING CONNECTION  
INSTRUCTIONS:

INSTRUCTIONS:

INSTRUCTIONS:

INSTRUCTIONS:

Push tube through
Collet into Body

Tube must seat firmly
At bottom of fitting

Push Collet against 
Body to release tube

6

Summary of Contents for PCP10EBQ

Page 1: ...R WITH QUASAR UVC LED Installation Instructions For UNIFILTERED PCPEBQ PCPEBQY 230V PCP10EBQ PCP10EBQY 230V FILTERED PF2CPEBQ PF2CP10EBQ OASIS International 222 East Campus View Blvd Columbus OH 43235...

Page 2: ...TRUCTIONS 6 INSTALLATION 7 QUASAR UVC LED OPERATION 8 SET UP GUIDE FOR DISPENSER PCB ELECTRONICS 2 1 PRODUCT SPECIFICATIONS 1 PRODUCT SPECIFICATIONS 1 PRODUCT SPECIFICATIONS 1 PRODUCT SPECIFICATIONS D...

Page 3: ...ROUGHING IN AND DIMENSIONAL DRAWING 3...

Page 4: ...VATE SENSOR WITHOUT WATER 2 IMPORTANT REQUIREMENTS 2 IMPORTANT REQUIREMENTS 2 IMPORTANT REQUIREMENTS 2 IMPORTANT REQUIREMENTS 4 BEFORE YOU START USING THIS WATER DISPENSER PLEASE READ THE FOLLOWING IN...

Page 5: ...Included a CONTACTLESS BOTTLE FILLER b STABILIZER BRACKET c OPTIONAL VERSAFILTER III d OPTIONAL REMEDI FILTER 5 VERSAFILTER III filtered models only CONTACTLESS BOTTLE FILLER STABILIZER BRACKET Remed...

Page 6: ...reduces its flow capacity and or stops it completely Fittings consist of two parts a body and a collet See figure below To install a tube push it through the collet until it seats firmly at the bottom...

Page 7: ...m the alcove filtered models only 2 Remove Front Panel by removing the 2 screws at the bottom of the panel on the sides See Diagram 2 6 INSTALLATION 6 INSTALLATION 6 INSTALLATION 6 INSTALLATION DIAGRA...

Page 8: ...r so that the rectangular lug on top of the filter faces forward 5 Push the filter up into the filter housing and rotate the filter one quarter turn to the right until it stops turning Refer to Diagra...

Page 9: ...t and feed 1 1 2 OD Drain Pipe through the hole See Diagram 4 5 6 INSTALLATION 6 INSTALLATION 6 INSTALLATION 6 INSTALLATION DIAGRAM 4 Front View DIAGRAM 5 Rear View P Trap Located behind the filter mo...

Page 10: ...5 for instructions on how to properly connect to quick connect fittings IMPORTANT Before connecting water supply to dispenser flush building water supply 8 Connect 1 1 2 OD drain pipe to Elbow Coupli...

Page 11: ...en close the Ball Valve 11 Check system for any leaks 12 Rotate the fan blade to see that it is free of obstructions 13 ENERGIZING UNIT Check the available power supply against the water dispenser dat...

Page 12: ...light near the top of the alcove will turn ON The LED will be BLUE when the QUASAR is working properly If QUASAR is not working properly then the LED light will be RED The light will remain ON and the...

Page 13: ...ngs are Bottle Count 0 5L 1 Bottle Flow Rate 1 2 GPM 20 second maximum dispense time To change the program settings follow these steps Top panel will need to be removed by taking out one screw on each...

Reviews: