6. INSTALLATION:
6. INSTALLATION:
6. INSTALLATION:
6. INSTALLATION:
STEPS 10 through 17:
10.
ENERGIZING UNIT: Check the available power supply against the water
dispenser data plate to assure correct electrical service. This water
dispenser is intended to be connected to a 20A minimum ground fault
circuit interrupting (GFCI) device to meet UL requirements. Plug Power
Supply Cord into outlet.
11.
DISPENSING/FLUSHING FILTERS (OPTIONAL)
•
Place a container in the alcove to activate water dispense. The flow of
water will be delayed until the filter fills with water.
•
Flush water through the system until the water becomes clear.
12.
Check system for any leaks.
13.
Rotate the fan blade to see that it is free of obstructions.
14.
Place bottle in alcove to purge additional air in Cooling Tank and water
lines. The Water Dispenser sensor will run for 20 seconds and shut-off.
Do this 2 or 3 times until a steady stream of water dispenses.
15.
SETTING UP PCB ELECTRONICS: Follow instructions in
Section 7
to
change default settings.
16.
Re-install Front Panel, and 2 screws.
17.
Set up is complete. Enjoy!
11