AEROBIC TREATMENT TANK DETAIL FOR
    NuWATER BNR-500 TREATMENT UNIT

OPERATING CAPACITY: 417 GALLONS
     FLOOD CAPACITY: 490 GALLONS

OPERATING CAPACITY: 421 GALLONS
     FLOOD CAPACITY: 494 GALLONS

STONE-FREE NATIVE SOIL
OR COMPACTED SAND
OVER STONY SOIL

  160 GALLONS
FLOOD: 191 GAL.

INSTALLATION INSTRUCTIONS

1) Excavate tank hole with vertical walls to 1 foot larger than
tank on all sides.
2) If bottom of hole is stony, install 3" of compact sand & level
out with screed.
3) Install tank in center of hole, keeping 1 ft. void space on
all sides.
4) As tank is filling with water, fill in void space with compact
granular (sandy) soil free of large clumps of clay.
5) Install rest of system, & affix risers to adapters with
waterproof adhesive.
6) Perform watertightness test in field as required by local
jurisdiction.
7) Upon approval to backfill, carefully backfill with native
soils over top of tank.
8) Final grade the surface to avoid chanelling surface
water toward tank.

54"

  24" BLOWER
HOUSING CAST
 ON TOP OF LID

TRASH CHAMBER

DIGESTER

CLARIFIER

24" RISERS (TYP)

12" RISER

4'-8"

9'-2"

TOP VIEW

SIDE VIEW

1" PVC (TYP)

WATERTIGHT

RISERS (TYP)

58"

4"

3"

DIFFUSER BARS (2)
PARALEL TO TANK WALL

 

50"

36"

4"

12"

1/2" PVC

AIRLINE

SLUDGE RETURN

1" X 1/2"

TEE

1" PVC SLUDGE
RETURN LINE

12"

2" TEE

2" PVC

6"

 

65"

DIGESTER CHAMBER

CLARIFIER
CHAMBER

TRASH CHAMBER

1.5" TAPER

MASTIC

53"

9'-2"

36" MAX.

1" = 2.8 ft.

1" = 1.4 ft.

2" COUPLING
& REDUCER

DUAL PORT AERATOR

LID VENT (typ)

Summary of Contents for BNR 500 GPD

Page 1: ...ion Owners Manual Class I Wastewater Treatment Systems 500 550 600 800 1000 1500 Gallon per Day Capacity Commercial and Residential Systems The Environmentally Friendly Alternative for Wastewater Trea...

Page 2: ...e treatment area waste is continually exposed to microbes for the remainder of the treatment process The digestion action of the aerobic microbes results in a lower concentration of pathogenic bacteri...

Page 3: ...designed to set the right environment for aerobic microbes to grow by having air pumped in with a specific formation The air is diffused into microscopic bubbles by low pressure diffusers This proces...

Page 4: ...sandy soil freeof largeclumps of clay 5 Install rest of system affix risers toadapters w ith w aterproof adhesive 6 Performw atertightness test infieldas requiredby local jurisdiction 7 Uponapproval t...

Page 5: ...5...

Page 6: ...ner s manual and verify that all required parts are on site Before the system package is installed inside of the unit each component should be carefully inspected for damage or defects Never install d...

Page 7: ...nded in the form of a Pre Trash tank This tank should be one compartment and should be between 500 and 1000 gallons Inlet and outlet baffle tees are advisable Pre Trash Options A simple single compart...

Page 8: ...t or replaced Check for vibrations against solid structures Check filter cover for proper torque Maintenance Requirements Ongoing maintenance contracts are required for advanced treatment The installe...

Page 9: ...introduced periodically to function properly If circumstances occur where the unit will not be used for long periods of time bioremediation is recommended to seed the system before functional use begi...

Page 10: ...not required to register your warranty Representatives will be responsible for all warranty information If you wish to register your warranty please call ENVIRO FLO Inc directly and your information w...

Page 11: ...defective components or materials for loss incurred because of interruption of service or for any other special consequential damages or incidental expenses arising from the manufacture sale or use of...

Page 12: ...annual basis a continuing service policy to cover labor for normal inspection maintenance and repair According to state law all owners of aerobic systems must maintain a factory authorized service pr...

Reviews: