![NUVE NC 300 User Manual Download Page 24](http://html1.mh-extra.com/html/nuve/nc-300/nc-300_user-manual_1719828024.webp)
24
AIR INTAKE: Following the drying phase; ambient air passing through the filter is given into the
chamber to break the vacuum and raise the chamber pressure to ambient pressure.
FINALIZING: The steam in the gasket is discharged and the gasket channel is vacuumed.
The door has to be opened upon completion of a cycle before repeating a
sterilization program. Otherwise, the program will not restart.
After sterilization, some condensate may be observed on sterile materials. It does
not show that the materials are not sterile and the sterilization cycle is unsuccessful.
DIN 58953 Part 7 Section 7 states that “…Small amounts of water on the surface of
packages do not represent a cause for concern if they dry completely within thirty
minutes after removal from a steam sterilization system...”
6.3.
SAMPLE REPORT
--------------------------------------------------------------------------------------
NUVE STEAM ART - NC 430
SERIAL NUMBER : 03-0025
--------------------------------------------------------------------------------------
FİRM : NUVE A.S.
ADDRESS : ANKARA
TELEPHONE : 312-3992830
DATE : 30. 10. 2013
TIME : 12:54:51
--------------------------------------------------------------------------------------
Program : WRAPPED,POROUS MATERIAL
Pre Heating : 58.4˚C
--------------------------------------------------------------------------------------
Program Phase
Pressure Temperature Time
Bar
˚C
Sn
Starting
-0.101
58.4
00:00
1.Pre Vacuum
-0.974
86.9
04:10
Steam Charge
0.508
104.0
04:38
2.Pre Vacuum
-0.983
89.2
08:30
Steam Charge
0.541
109.5
09:01
3. Pre Vacuum
-0.983
90.1
12:54
Steam Charge
0.513
108.1
13:23
4. Pre Vacuum
-0.979
90.1
17:13
Steam Charge
0.526
107.6
17:42
Heating
2.100
134.3
19:10
Steriliz. Start
2.100
134.3
19:10
Steriliz. End
1.986
135.4
26:09
Steam Discharge
0.093
104.8
27:10
Vacuum Drying
Drying start
-0.707
89.1
27:55
Drying Cont
-0.714
89.2
27:56
Drying Cont
-0.984
71.6
35:24
DryingEnd
-0.985
62.5
38:16
Process Finish
-0.147
62.2
38:50
--------------------------------------------------------------------------------------
LOAD STRILE
--------------------------------------------------------------------------------------
Sterilization Time :
39:07 Min
Finish Time :
13 : 34 : 03
--------------------------------------------------------------------------------------
13
3
5
--------------------------------------------------------------------------------------
OPERATOR NAME :
SIGNATURE :
13
3
5
Year
Daily Run
Total Run
Summary of Contents for NC 300
Page 12: ...12 5 6 GENERAL PRESENTATION Figure 3 1 2 3 4 5 6 7 8...
Page 18: ...18...