background image

 

 

 

NSS Series 

Nuvair 

 

Page 23 

www.Nuvair.com 

 

11.0  Maintenance Register 

 

 

11.1  Customer Service 

 

Customers continue to receive assistance after the purchase of a fill containment station. To this end 

Nuvair 

has created a customer service network covering the entire country.  

 

 

11.2  Scheduled Maintenance 

 

The scheduled maintenance program is designed to keep your fill containment station in perfect working order. 

Some simple tasks, described in this manual, can be carried out directly by the customer; others, instead, 

require that the work be carried out by trained personnel. For the latter we recommend you always contact our 

office. This section provides a simple tool with which to request assistance and register completed scheduled 

maintenance work. Start-up and maintenance checks/tasks, once completed by our qualified technician, are 

registered in this maintenance chapter by way of an official stamp, signature, and inspection date; the number 

of working hours is also registered. The maintenance schedules/coupons easily let you know when our 

assistance service should be contacted to carry out work.

 

 

 

11.3  Nuvair Customer Care Contact 

 

 

 

 

Telephone:  +1.805.815.4044 

 

 

 

Fax:    

+1.805.486.0900 

 

 

 

E-mail:  

[email protected]

 

 

 

 

Web:   

www.Nuvair.com/

  

 

 

12.0  Spare Parts List 

 

Fill Containment Station System Components 

Type 

Part Number 

SCBA Fill Whip & Valve for Containment Station 

SCBA 

NS-WHIP-SCBA 

Regulator for Containment Station 

High-Pressure 

NS-REG 

Oxygen Compatible Air (OCA) Filter Elements 

Drying Filter Cartridge 

X96677 

Breathing Air Filter 

X96337 

Filter Tower Wrench 

Stainless Steel 

TL-033 

Summary of Contents for NSS Series

Page 1: ...Operation Manual Fill Containment Station SKU NSS 2P OCA as shown...

Page 2: ...n contained within Nuvair however retains the right to modify its contents without notice Under Nuvair s system of continuous improvement certain components may be updated or changed as higher quality...

Page 3: ...ation 12 8 0 Checks for the Start of Each Working Day 12 8 1 Check Refill Hoses 12 8 2 Storing Technical Documentation 12 9 0 Fill Containment Station Operation 13 10 0 Maintenance 19 10 1 Foreword 19...

Page 4: ...t hazard related 1 2 System Description The Nuvair NSS Fill Containment Station Series is designed for use while filling high pressure gas cylinders DIN yoke or SCBA The all steel construction of the...

Page 5: ...essential component of the supplied fill containment station These regulations instructions are intended for an operator who has already been trained to use this type of fill containment station The...

Page 6: ...essure Use the fill containment station in areas free from dust risk of explosion corrosion and fire Improper use could have serious consequences for the user Do not disconnect the hose from the fitti...

Page 7: ...the fill containment station is pressurized Do not empty storage tanks completely not even for long term storage as this practice allows damp air to get in and eventually corrode the tank It is forbid...

Page 8: ...arts are left on the fill containment station 9 Do not use flammable solvents for cleaning 10 Exercise cleanliness during maintenance and when making repairs Keep dirt away from parts by covering part...

Page 9: ...nment Station Layout Storage Bank 1 Gauge Panel Valve Storage Bank 2 Gauge Panel Valve Pneumatic Door Open Close Switch Fill Station 1 Gauge Valve Regulated Fill Pressure Gauge Fill Station 2 Gauge Va...

Page 10: ...vair Page 10 www Nuvair com WARNING Turn off compressor input valve if transferring gas mixtures of more than 21 oxygen content between Storage Bank 1 and Storage Bank 2 Compressor Input Valve OCA Fil...

Page 11: ...tainment station carefully every day it is used as per the checklist given in this manual 5 0 Safety Information Labels Location Description Safety information labels are affixed to various parts of t...

Page 12: ...necessary or contact Nuvair 8 1 Check Refill Hoses Inspect the refill hoses and make sure there are no cuts holes abrasions leaks etc If necessary replace with new hoses 8 2 Storing Technical Document...

Page 13: ...llow procedures described below and as illustrated in Figure 4 Check that cylinders to be refilled are in good condition o Cylinders must be inspected as required by local law and have evidence stampe...

Page 14: ...damage caused by moisture intrusion Step 2 Turn HP to HP regulator counterclockwise decrease Step 3 Open front door by turning door switch Door opens automatically Step 4 Check cylinder for proper rat...

Page 15: ...vair Page 15 www Nuvair com Step 6 Connect fill whip to cylinder Step 7 Close fill whip bleed drain Step 8 Open cylinder valve Step 9 Close door Step 10 Open fill station valve Step 11 Open tank fill...

Page 16: ...ncrease regulator pressure to desired fill pressure Step 13 When cylinder is full close tank fill valve Step 14 Open fill station door Step 15 Close cylinder valve Step 16 Open fill whip bleed valve t...

Page 17: ...s Nuvair Page 17 www Nuvair com Step 20 Close fill station door Step 21 Turn fill supply off Step 18 Remove cylinder from compartment Step 19 Repeat steps 4 to 18 to fill additional cylinders or go to...

Page 18: ...of fill whip fitting See image below for additional information Bleed pressure from fill whip valve before removing fitting from cylinder SKU GO18 Bleed pressure from fill whip valve before removing f...

Page 19: ...cording to the most advanced technological criteria requires only minimum preventive and routine maintenance The residual pressure present in the fill containment station and all lines must be release...

Page 20: ...paper mounted inside the cartridge element turns white or a color other than blue The fill containment station comes standard with one 1 drying filter SKU X96677 and one 1 breathing air filter SKU X9...

Page 21: ...from the wall socket WARNING Be sure that all pressure has been relieved from the system prior to opening any filtration canister Failure to vent pressure from the system prior to opening the caniste...

Page 22: ...are correctly connected and in good condition Check also that the valves on any unused hoses are closed properly to prevent the dangers associated with hose whipping To change the tank refill hoses p...

Page 23: ...t assistance and register completed scheduled maintenance work Start up and maintenance checks tasks once completed by our qualified technician are registered in this maintenance chapter by way of an...

Page 24: ...NSS Series Nuvair Page 24 www Nuvair com 13 0 Service Log Date Technician Name Service Performed...

Page 25: ...mg m 5 mg m Odor None None Notes Dew point of supply air must be 10o F 6o C colder than coldest ambient air expected Supply air delivered to the membrane system must contain 0 003 PPM oil vapor 14 2...

Page 26: ...plied to them are considered expendable and are not covered under the terms of this policy This includes maintenance and consumable items listed as part of a suggested maintenance program included wit...

Page 27: ...uvair This card is to establish registration for any necessary warranty work and as a means of communication that allows Nuvair to contact the user regarding this product The user must notify Nuvair o...

Page 28: ...Series Nuvair Page 28 www Nuvair com Nuvair Phone 1 805 815 4044 Fax 1 805 486 0900 Address 1600 Beacon Place Oxnard CA 93033 USA Email info nuvair com Website www Nuvair com Rev 08 2022 SKU NSS Seri...

Reviews: