Operating Instruction and Documentation
UNI-LIFT 2500
- 23 -
Pic. 7: choice of the dowel length without floor pavement or tile surface
Table to pic. 7
Liebig-dowels
Dowel
type
B20/75 B20/100
Drilling
depth a
115 140
Min.
anchorage
depth
b
85
85
Thickness
of
concrete
c
180 180
Diameter
of
bore d
20
20
Thickness
of
the
lift-pieces e
0-40
40-65
Number
of
dowels
12
12
Starting torque
according to dowel manufacturer
It is possible to use equivalent safety-dowels (with license) of other manufacturer but observe their regulations.
Summary of Contents for UNI-LIFT 2500
Page 9: ...Operating Instruction and Documentation UNI LIFT 2500 9 2 5 Page for notice...
Page 11: ...Operating Instruction and Documentation UNI LIFT 2500 11 3 3 Data sheet...
Page 37: ...Operating Instruction and Documentation UNI LIFT 2500 37 Electrical diagram drawing...
Page 38: ...Operating Instruction and Documentation UNI LIFT 2500 38...
Page 39: ...Operating Instruction and Documentation UNI LIFT 2500 39...
Page 41: ...Operating Instruction and Documentation UNI LIFT 2500 41...
Page 42: ...Operating Instruction and Documentation UNI LIFT 2500 42...
Page 43: ...Operating Instruction and Documentation UNI LIFT 2500 43...
Page 44: ...Operating Instruction and Documentation UNI LIFT 2500 44 Hydraulic diagram drawing...