background image

 

   Operating Instruction and Documentation 

                                                                                                                                  UNI-LIFT 2500 

 

 

- 20 - 

•  Raise the UNI-LIFT  to a height of 1500 mm. 
•  Adjust the lift: first one base plate, than the second base plate. If there is an uneven floor 

even it with metal sheets. A continuous contact between the floor and the base plate must be 
guaranteed to avoid hollow spaces. Dowel the lift: 

 

 

Nußbaum Company demands LIEBIG safety dowels (German dowel manufacturer)  or 
equivalent  dowels of other manufacturer but: observe their regulations. 

 

 

Before doweling check the concrete floor (with quality B25!) if the concrete floor goes to the 
top edge of the floor. For an existing concrete floor the dowels have to be chosen according 
to Pic. 7. If floor tiles are on the concrete floor, the dowels have to be chosen according Pic. 
8. Its important for the trouble-free working that the base plate are clean and the guides of 
the sliding block are clean and greased. 

 

Check the adjustment of the base plates and dowel the lift: Bore the holes to fix the dowels 

through the borings of the base plates. Clean the holes with pressure air. Put in the safety 

dowels. 

•  If necessary dowel the operating unit at the floor. 

 • 

 

Tighten the Liebig-dowels with the dynamometric key (M = 80Nm). 

 

Each Liebig dowel must be tightened with the demanded torque. Otherwise the normal  
and secure function of the lift can not guaranteed. Observe the regulations of the 
other dowel-manufacturer.

 

 

•  Raise and lower the lift several times with load. Check the torque of the dowels and check 

the hydraulic hoses  tightness. 

 

•  Equalize the lift, if this is necessary. 

 

•  Mount the covers: Do not damage the cables.

 

 

9.3 Initiation 

 

Before the initiation a security check must be performed. Therefore use form: First 
security check. 

 
If the lift is installed by a competent person, he will perform this security check. If the 
operator installs the lift by himself, he has to instruct a competent person to perform the 
security check. 
The competent confirms the faultless function of the lift in the installation record and form for 
the security check and allows the lift to be used. 

 

Please send the filled installation record to the manufacturer after the installation.

 

 

9.4 Changing the installation place 

 

If the place of installation shall be changed, the new place has to be prepared in according to 
the regulations of the first installation. The changing should be performed in accordance with 
the following points: 

 

•  Raise the lift on approx. 1000 mm. 
•  Remove the cover of the hydraulic tubes. 
•  Loose the dowels. 
•  Lower the lift in the lowest position. 

Summary of Contents for UNI-LIFT 2500

Page 1: ...2006 Operating Instruction and Documentation Serial number Nu baum Hebetechnik GmbH Co KG Korker Stra e 24 D 77694 Kehl Bodersweier Tel 49 0 7853 8990 Fax 49 0 7853 8787 E mail info nussbaum lifts de...

Page 2: ...ns 12 5 Operating instructions 12 5 1 Lifting the vehicle 12 5 2 Lowering the vehicle 13 5 3 Equalisation of the rails 13 6 Troubleshooting 14 6 1 Driving on an obstacle 14 6 2 Emergency lowering 15 7...

Page 3: ...the lift Especially the chapter Safety accident Prevention has to be observed In addition to the safety remarks of the instructions for use the regulations and instructions being valid at the place of...

Page 4: ...nd time intervals including Details for exchange of parts part components as mentioned in the instructions for use are to be adhered These works must only be carried out by expert personal After maint...

Page 5: ...ety was checked and the lift was started The installation was effected from the operating authority competent please delete as applicable The safety of the automotive lift was checked from the compete...

Page 6: ...was started The persons below were introduced after the installation of the automotive lift The introduction was carried out from an erector of the lift manufacturer or from a franchised dealer compe...

Page 7: ...lift They are called experts and competent persons in this document Experts are persons for example self employed engineers experts which have received instruction and have experience to check and to...

Page 8: ...lift or on the vehicle It s not allowed to install the standard automotive lift in a hazardous location or washing bays After changes of the construction after essential maintenance work on carrying...

Page 9: ...Operating Instruction and Documentation UNI LIFT 2500 9 2 5 Page for notice...

Page 10: ...valve ca 255 bar with 2500 kg Oil tank approx 11 Litre Sound level 75 dBA Connection by customer 3 N PE 400V 50 Hz standard version with fuse T16A Pay attention to the voltage of your state 3 2 Safety...

Page 11: ...Operating Instruction and Documentation UNI LIFT 2500 11 3 3 Data sheet...

Page 12: ...ssengers on the lift or in the vehicle It s not allowed to climb onto the lift or onto a lifted vehicle The automotive lift must be checked from an expert after changes in construction or after repair...

Page 13: ...its lowest fully collapsed position 5 3 Equalisation of the rails Continuous duty of the lift without reaching the lowest position there might be an un equalisation of the two rails functionally Norma...

Page 14: ...ive hydraulic valve Gear pump is defective Coupling from the motor is faulty Solution unload the vehicle refills check the screws Call the service partner Call the service partner Call the service par...

Page 15: ...t an object wood height 30 mm between the hydraulic cylinder and the safety ratchet so the teeth of the ratchets can not engaged in the ratchet strip see Pic Make these process on both cylinder Pic 3...

Page 16: ...bricate the moving parts of the lift hinge bolts sliding pieces sliding surfaces grease with a multipurpose lipid example Auto Top 2000 LTD Agip Grease the lubricate nipples with a multipurpose lipid...

Page 17: ...ter this is complete use a suitable paint observe the RAL Number Check the zinc surface and repair it with a suitable tool Use abrasive paper grain 280 White rust can result from moisture laying in ce...

Page 18: ...all dirt carefully with a sponge or if necessary with a brush Ensure that no washing up liquid is left on the lift after cleaning Do not use aggressive means for cleaning the workshop floor and the a...

Page 19: ...recommended Plug type connection bay customer If the plug type connection is on a height of about 2 meter and only approachable with devices In this case it is necessary to fasten a separate lockable...

Page 20: ...dowels with the dynamometric key M 80Nm Each Liebig dowel must be tightened with the demanded torque Otherwise the normal and secure function of the lift can not guaranteed Observe the regulations of...

Page 21: ...e blind plugs to close the hoses Disconnect the power supply Transport the lift to its new place Install the lift in accordance with chapter 9 Installation and Initiation Equalize and deaerate the lif...

Page 22: ...ehe den aktuellen Fundamentplan see current foundation diagram drawing vois le plan de fondation actuel Bohrerdurchmesser diameter of bore Diam tre de l al sage do 15 18 24 Bauteildicke thickness of t...

Page 23: ...owel type B20 75 B20 100 Drilling depth a 115 140 Min anchorage depth b 85 85 Thickness of concrete c 180 180 Diameter of bore d 20 20 Thickness of the lift pieces e 0 40 40 65 Number of dowels 12 12...

Page 24: ...135 B20 175 Drilling depth a 140 165 175 215 Min anchorage depth b 85 85 85 85 Thickness of concrete c 180 180 180 180 Diameter of bore d 20 20 20 20 Thickness of the lift piece e 40 65 65 90 90 100 1...

Page 25: ...anufacturer after installation 9 6 Change of lift location If the place of installation is to be changed the new place has to be prepared in according to the regulations of the first installation The...

Page 26: ...control valve 4 filling plug 5 equalisation lever ball valve 6 hydraulic pressure switch SL tube return in the tank H1 tube lifting KL tube ratchet D1 tube equalisation pic 9 connection the hydraulic...

Page 27: ...ing F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F...

Page 28: ...ng F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F...

Page 29: ...ng F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F...

Page 30: ...ng F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F...

Page 31: ...ng F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F...

Page 32: ...ng F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F...

Page 33: ...ng F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F...

Page 34: ...ng F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F...

Page 35: ...ng F F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F...

Page 36: ...F F Torque of the dowels and screws F F F Fixed seat of the screws F F F Condition surface piston rod F F F Condition coverings F F F Condition electrical wires F F F Level of hydraulic oil F F F Cond...

Page 37: ...Operating Instruction and Documentation UNI LIFT 2500 37 Electrical diagram drawing...

Page 38: ...Operating Instruction and Documentation UNI LIFT 2500 38...

Page 39: ...Operating Instruction and Documentation UNI LIFT 2500 39...

Page 40: ...r erreichbar mit Hilfsmitteln z b einer Leiter muss ein separater abschlie barer Hauptschalter in erreichbarer H he angebracht werden Plug type connection bay customer If the plug type connection is o...

Page 41: ...Operating Instruction and Documentation UNI LIFT 2500 41...

Page 42: ...Operating Instruction and Documentation UNI LIFT 2500 42...

Page 43: ...Operating Instruction and Documentation UNI LIFT 2500 43...

Page 44: ...Operating Instruction and Documentation UNI LIFT 2500 44 Hydraulic diagram drawing...

Page 45: ...r 400 V 50 Hz 3 kW 0 4 gear pump 3ccm revolution 0 5 oil filter 0 6 hydraulic block 0 7 pressure relief valve 0 8 4 3 way valve 0 9 holding valve 0 10 screen 0 11 hydraulic pressure switch 0 12 screen...

Reviews: