Operating instructions and documentation
4.50H/ 4.50H plus
- 38 -
The operating unit is not connected when the lift is delivered.
The-conductor bunch is coming from the rail.
Put the cable into the bolt connection at the top of the operating unit.
1. Open the operating unit.
2. Connect the electrical cable (with 7 leads)as following.
Described with the operating unit:
- Every lead of the cable has number on the side.
Put the cable in the numerated part and fasten it.
3. Cable No. 6 and No.7 are not needed.
4. Cable No. 5 connect it with the press button.
Close the cover.
.
9.7 Position of the columns
Klinke = ratchet
Seil = rope
Auffahrrichtung = drive-on direction