background image

RACC MOD21  USA VER7 NCOL

NUPI Americas, Inc.

 - 1511 Superior Way, Houston, TX 77039 -Tel: 281 590  471 - Fax: 832 201 8537

Web site: www.nupiamericas.com - Email:[email protected]

ELECTROFUSION BRANCH SADDLE INSTALLATION

1.  Measure the length of the fitting and mark the welding area with a marker. Scrape the pipe 

surface carefully using a scraper.

2.  After scraping, remove dirt and grease from the welding area of the pipe and the inside of the 

saddle, using an appropriate cleaning agent. Wait until the clean parts are completely dry.

3.  Apply the saddle onto the pipe watching out not to dirty the previously cleaned surfaces.

4.  Fasten the saddle on the pipe using the

 

QUICK-COUPLING PLASTIC UNDERCLAMP: 

hook up the 

square holes of the underclamp to the teeth of the upper 

part. Line up the metal spacer and use a wrench to tighten 

the two screws until they are in position 

A

 in the lower part 

(feel the screws sticking out the bottom).

 

FLEXIBLE BELT: 

use a wrench to tighten the four screw 

nuts until the U-bolt 

A

 and the top part of saddle 

B

 come 

into tight contact.

5.  Connect the two cables of the electrofusion machine to the connectors of the branch saddle, 

scan the barcode with the barcode scanner or enter the welding parameters manually. After 

completing the welding process, verify that no material has leaked out of the joint between the pipe 

and the fitting and wait for the completion of the cooling time indicated on the barcode.

Reviews: