9.1
Safety Requirements for the Installation
The installation and electrical connections must be performed, as regards the machine,
according to the indications provided by the Manufacturer. You must also take account
of all national regulatory and legislative requirements of the country where the machine
is installed, performing all the operations of installation and connection to perfection.
All installation operations must be performed in the absence of energy.
9.2
Preliminary Checks
Upon delivery, please check the condition of the machine, checking in particular the following points:
Alignment of surfaces
Integrity of the slide rails.
That the different parts of the machine does not display physical damage from bumps, tears or
abrasions.
Visually check the integrity of the electrical wiring
The integrity of the electrical controls.
Check the adjustment / handling wheels (only for sawing machines with manual movement
axes).
Of the jambs adjustment and locking devices.
Of the various protections.
Make sure there are no signs or dents on the casings and on mechanical parts indicative of
bumps during transport.
It is recommended not to deposit anything on the machine work space.
If there is damage, do not install the machine and contact the Manufacturer describing the anomalies.
9.3
Installation Preparations – Minimum Spaces
- Ensure that in the installation area there is room for maneuver necessary for unpacking and handling
the machine.
- The floors of workplaces must have no holes or dangerous projections, or be slippery.
- It is also recommended to check the flatness of the surface on which you are going to install the
machine which must be sufficient to ensure a flat and proper support.
- The support in reinforced concrete floor must ensure the support of the weight of the machine, the
weight of the pieces that the machine has to process and of any transport equipment or element
positioned in the vicinity of the same which serves to perform the loading and unloading of the pieces
from the machine.
- The foundation must be designed and set up by the Customer and by specialized personnel.
- The space around the machine must also be left free after the installation is complete to allow
subsequent routine and extraordinary maintenance operations on the machine.
- Check that the installation of the electrical power source has been prepared as indicated by the
values given on the CE plate of the machine.
The installation and connections must be performed, as regards the machine, according to the
indications provided by the Manufacturer. You must also take account of all national regulatory
and legislative requirements of the country where the machine is installed, performing all the
operations of installation and connection to perfection.
Summary of Contents for MANTA COMPAT 200 LX
Page 78: ...Page 78 of 87 301011_R00_IT ...
Page 79: ...301011_R00_IT Page 79 of 87 ...
Page 80: ...Page 80 of 87 301011_R00_IT ...
Page 81: ...301011_R00_IT Page 81 of 87 ...
Page 82: ...Page 82 of 87 301011_R00_IT ...
Page 83: ...301011_R00_IT Page 83 of 87 ...
Page 84: ...Page 84 of 87 301011_R00_IT ...
Page 85: ...301011_R00_IT Page 85 of 87 ...
Page 86: ...Page 86 of 87 301011_R00_IT ...