![Nucraft Saber Conference Installation Instructions Manual Download Page 5](http://html1.mh-extra.com/html/nucraft/saber-conference/saber-conference_installation-instructions-manual_1716392005.webp)
Step 2: Center Base Installation
•
For tables 168” and longer slide (2) main beams together onto the clamp bars positioning
such that the (2) main beams meet in the center of the base. Using the Allen wrench, tighten
cap screws.
•
For Sightline ONLY: Tighten locking bolt once all bases are secured to beams.
•
Leveling: Place a level on the main beams to ensure that the base structure is level side to
side and end to end. Adjust glides as necessary to level the bases prior to installing the top.