Nucraft Saber Conference Installation Instructions Manual Download Page 4

Step 1: End Base Installation

Loosen (Do not remove) 5/16” cap screws attached to 
clamp Bars.

Slide main beams into position with the clamp bars 
aligned in the slots of the main beam.

NOTE: For sightline with center column base only 
shorter beams mounted between wider bases.

Beams should overhang the base as following: 

NOTE: Dimensions are approximate. Saber allows 
the bases to be positioned where needed for floor 
core locations, etc.

a.

48” Wide Tables

1.

Panel Base = 5

2.

Column 

Base = 1”

b.

60” Wide Tables

1.

Panel Base = 11

2.

Column 

Base = 7”

Using the Allen wrench, tighten cap screws to secure 
bases to the main beams.

Reviews: