![Nucraft Saber Conference Installation Instructions Manual Download Page 4](http://html1.mh-extra.com/html/nucraft/saber-conference/saber-conference_installation-instructions-manual_1716392004.webp)
Step 1: End Base Installation
•
Loosen (Do not remove) 5/16” cap screws attached to
clamp Bars.
•
Slide main beams into position with the clamp bars
aligned in the slots of the main beam.
–
NOTE: For sightline with center column base only
shorter beams mounted between wider bases.
•
Beams should overhang the base as following:
–
NOTE: Dimensions are approximate. Saber allows
the bases to be positioned where needed for floor
core locations, etc.
a.
48” Wide Tables
1.
Panel Base = 5
”
2.
Column
Base = 1”
b.
60” Wide Tables
1.
Panel Base = 11
”
2.
Column
Base = 7”
•
Using the Allen wrench, tighten cap screws to secure
bases to the main beams.