04. 02. 20. Document Number 671712
2
Nuaire |
Western Industrial Estate
|
Caerphilly
|
CF83 1NA
|
nuaire.co.uk
SVT28
Installation Manual
1.2 Important Information
This manual contains important information on the safe and
appropriate assembly, transport, commissioning, operation,
maintenance, disassembly and simple troubleshooting of the product.
While the product has been manufactured according to the accepted
rules of current technology, there is still a danger of personal injury or
damage to equipment if the following general safety instructions and
the warnings contained in these instructions are not complied with.
•
Read these instructions completely and thoroughly before
working with the product.
•
Keep these instructions in a location where they are accessible
to all users at all times.
•
Always include the operating instructions when you pass the
product on to third parties.
1.3 Personal Protective Equipment
The following minimum Personal Protective Equipment (PPE) is
recommended when interacting with Nuaire product:
•
Protective Steel Toed Shoes -
when handling heavy objects.
•
Full Finger Gloves (Marigold PU800 or equivalent) -
when
handling sheet metal components.
•
Semi Fingerless Gloves (Marigold PU3000 3DO or equivalent)
- when conducting light work on the unit requiring tactile
dexterity.
•
Safety Glasses
- when conducting any cleaning/cutting operation
or exchanging filters.
•
Reusable Half Mask Respirators
- when replacing filters which
have been in contact with normal room or environmental air.
Nuaire would always recommend a site specific risk assessment by a
competent person to determine if any additional PPE is required.
2.0 INTRODUCTION
The Nuaire SVT28 impulse unit comprises a high temperature axial fan
with specially designed inlet and outlet attenuators which, along with
the fan unit, are encased in an Aluzinc acoustic enclosure.
The Nuaire SVT28 unit comprising fan/motor assembly, and inlet &
outlet silencers shall be certified for high temperature operation at
400°C for 2 hours, the range shall have been type tested to EN12101-3.
The units shall be either 2 speed or inverter driven providing, low
speed for day to day environmental ventilation and one off operation
for emergency ventilation (S1 duty). They shall also be suitable for
reversible operation.
Fully reversible options (i.e. similar duty in both airflow directions) are
available, please contact Nuaire for details.
The unit shall have a unique mounting bracket, which shall enable the
bracket to be positioned as a “first fix” component
with the unit being fitted as a “second fix” component, avoiding
possible mechanical damage.
The Nuaire SVT28 unit shall have inlet guards for safety purposes and
also to prevent debris being pulled through the fan.
It also has a specially designed airflow deflector to direct the jet stream
from the fan at the required angle sufficient to overcome the natural
buoyancy effect of the smoke (Section 4.3).
EN12101-3 compliant, refer to EC certificate of conformity,
0086-CPR-672476.
2.1 Code Description:
SVT28 - 1 A G
| | | |
1 2 3 4
1. Range:
Impulse Axial Fan, 400°C for 2 hrs
2. Case Size:
1 or 2
3. Impeller Blade Angle:
A, B, C, D or E
3. Electrical Motor Details:
No Suffix = 400V / 50Hz
G = 460V / 60Hz
J = 460V / 60Hz
3.0 DELIVERY & HANDLING
All equipment is inspected prior to despatch and leaves the factory in
good condition. Upon receipt of the equipment an inspection should
be made and any damage indicated on the delivery note. Particulars of
damage and/or incomplete delivery should be endorsed by the driver
delivering the goods before offloading by the purchaser.
No responsibility will be accepted for damage sustained during the
offloading from the vehicle or on the site thereafter. All claims for
damage and/or incomplete delivery must be reported to Nuaire within
two days of receipt of the equipment.
Always handle the units carefully to avoid damage and distortion. If
mechanical aids are used to lift the unit, spreaders should be employed
and positioned so as to prevent the slings, webbing etc. making contact
with the casing.
4.0 MECHANICAL INSTALLATION
Installation must be completed by competent persons, in accordance
with good industry practice and should conform to all governing and
statutory bodies regulations i.e. IEE, CIBSE, etc. and EN standards etc.
Before commencing installation check that all material, including
mounting feet and optional ancillaries are available to complete the
work. Every unit is tested and serialised at works and a test certificate
produced, the details are also recorded on the fan side rating plate
which should also be referred to before handling and installation. Any
damage or deviations should be immediately reported to the seller /
supplier / agent quoting the order and rating plate details.
4.1 Fixing Support Bracket to Ceiling
The support bracket is included with the unit. Using the four slots in
the top side of the bracket attach to the ceiling ensuring that it is firmly
fixed and able to take the weight (100kg) of the SVT28 unit.
1
Unit Lifting