NuAire MRXBOX95-LOFT Installation And Maintenance Manual Download Page 7

7

14. 02. 14. Leaflet Number 671438

Installation and Maintenance

MRXBOX95-LOFT Mechanical Ventilation with Heat Recovery

Isolation - Before commencing work make sure that the unit,

switched live and Nuaire control are electrically isolated 

from the mains supply and switched live supply. 

5.0  Ancillaries

Passive Infra red detector: 

MRXBOX95-PIR

External Humidity sensor: 

MRXBOX95-HUM

Remote Fail Indicator: 

MRXBOX95-RFI

Loft Stand: 

MVHR-LOFT-STAND 

(see figure 8).

If the unit needs to be raised in the loft space, then a stand

should be used.

The four ‘L’ shape brackets should be fitted to the main unit and

this in turn should be bolted to the stand. Place the additional

AV pads on to the stand before bolting to the stand using the

pre inserted holes (Please refer to section 2 to ensure the 

correct fitting of the ‘L’ shaped brackets).

6.0 Commissioning

1.

For the required airflow rates refer to the design 

specification for the property or refer to Building 

Regulations Part F.

2.

The unit is supplied with control of both the normal 

airflow and boost airflow. (see figure below).

3.

Commissioning should be carried out using a moving 

vane anemometer in conjunction with a hood.

4.

Once commissioned the house owner / tenant should 

be informed that the unit should not be adjusted as it 

will have a detrimental effect on the indoor air quality 

and could result in condensation and mould growth.

7.0 Maintenance/Cleaning

Please allow 300mm each side of the unit to allow access for 

maintenance purposes. 

1.

Replace filters every 5 years. 

Remove the top cover and 

slide out the two G4 filters fitted either side of the heat 

exchanger. Replace with new filters.

2.

Inspect heat exchanger every 5 years.

Generally check for

damage and security of components. Refit top cover.

3.

Inspecting motors.

Motors can be accessed through 

removal side panels.

8.0 Replacement of Parts

Should any component need replacing Nuaire keep extensive

stocks for quick delivery. Ensure that the unit is electrically 

isolated, before carrying out any work. 

When ordering spare parts, please quote the serial number of

the unit and the ARC number of the purchase if possible.

(This information will be available on the fan label).

9.0 Warranty

The 5 year warranty starts from the day of delivery and

includes parts and labour for the first year and parts only for

the remaining 4 years. This warranty is conditional on planned

maintenance being undertaken

.

10.0 Service Enquiries

Nuaire can assist you in all aspects of service. Our service 

department will be happy to provide any assistance required, 

initially by telephone and If necessary arrange for an 

engineer to call.

Technical Support 

029 2085 8400

Figure 9. Detail of unit control on side panel.  

Figure 10. Removing filters. 

Technical or commercial considerations may, from time to time,

make it necessary to alter the design, performance and 

dimensions of equipment and the right is reserved to make such

changes without prior notice.

Figure 8. MVHR-LOFT-STAND.

Summary of Contents for MRXBOX95-LOFT

Page 1: ...of the unit see figures 2a 2b and 2c for fixing details Lower the unit with the L shape fixing brackets attached onto the joists Mark through the brackets and drill four clearance holes into the top...

Page 2: ...move any burr and file if necessary to remove any external sharp edges Mark the socket depth on the pipe and check that the pipe section to be jointed is free of any surface damage which may affect th...

Page 3: ...ce MRXBOX95 LOFT Mechanical Ventilation with Heat Recovery Figure 4 Typical MVHR ducted arrangement for a loft mounted unit using the Nuaire condensation trap 125mm dia CONTRAP 125 2 3 Extract input a...

Page 4: ...FROM TOP Condensate Drain 21 5mm dia condensate drain 21 5mm dia condensate drain alternative position SIDE VIEW controls 3 0 Dimensions mm Figure 6 Figure 5 Main unit components shown with front and...

Page 5: ...bles or switched live cables should not be placed within 50mm of other cables or on the same metal cable tray as other cables 4 0 Electrical Connection Please note the electrical connection of the uni...

Page 6: ...re opened this includes no power supply at the unit c Data Cable installation A 4 core data cable is used to connect devices such as sensors to the fan and for interconnecting multiple fan units Do no...

Page 7: ...0 Maintenance Cleaning Please allow 300mm each side of the unit to allow access for maintenance purposes 1 Replace filters every 5 years Remove the top cover and slide out the two G4 filters fitted e...

Page 8: ...affected 3 2 When handling the equipment care should be taken with corners and edges and that the weight distribution within the unit is considered Lifting gear such as slings or ropes must be arrang...

Reviews: