1.0 Introduction

MRXBOX95-LOFT is designed to provide mechanical supply

and extract ventilation with heat recovery. 

The unit is fitted with two independent fans. Each fan has full

speed control for background and boost ventilation rates as

well as a run-on timer facility. 

To recover heat from the extract air the heat exchanger block 

is utilised. This heat exchanger can recover up to 95% of the

normally wasted heat.

2.0 Installation

Installation must be carried out by competent personnel in

accordance with the appropriate authority and conforming

to all statutory governing regulations.

All mains wiring must be in accordance with the current I.E.E.

Regulations, or the appropriate standards. Ensure that the

mains supply (Voltage, Frequency and Phase) complies with

the rating label.

Please note a clear working space is required around the

installed unit to allow the cover to be removed and provide 

sufficient access for maintenance such as filter change.

The fan must be installed indoors, away from direct sources of

frost, heat, water spray or moisture generation. 

The unit is designed for mounting on the roof joists in the loft

space using four “L shape” metal brackets and four A.V.

mounts supplied with the unit. Please note that various 

positions for the brackets are available to suit different joist

centres.

Connect the four ‘L’ shape fixing brackets to the unit with the 

M4 screws (provided) they can be attached to the long, or

short sides of the unit depending on requirements. Each pair of

brackets should be mounted at different heights so the fall is

towards the drip tray end of the unit. (see figures 2a, 2b and

2c for fixing details). Lower the unit with the “L” shape fixing

brackets attached onto the joists.  Mark through the brackets

and drill four clearance holes into the top surface of joists.

Locate anti-vibration mounts (supplied) above and below each

bracket fixing point hole and, using 4 suitable screws (not 

provided) and washers, fix the unit to the joists (see fig 2b). 

Do not overtighten the fixings. The distance from the top

washer on the A.V. mount to the joist when installed must

not be less than 30mm.

Nuaire Limited

Western Industrial Estate  Caerphilly  United Kingdom  CF83 1NA  

T: 029 2085 8400  F: 029 2085 8444  E: [email protected]  W: www.nuaire.co.uk

1

14. 02. 14. Leaflet Number 671438

MRXBOX95-LOFT

Mechanical Ventilation Unit with 

Heat Recovery for Loft Mounting

Installation and Maintenance

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Spigot 2.

Spigot 4.

Spigot 3.

Spigot 1. 

21.5mm Condensate drain 

outlet. Optional either side.

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M20 & M16 cable 

glands mains entry & 

blanking gland.

Controls.

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 1. Airflow through unit.

The EMC Directive 

2004/108/EC  

The Low Voltage 

Directive 

2006/95/EC

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Two fixing brackets 

should be attached 

on the non-control 

end of the unit via  

the two lower hole 

positions. 

(see figure 2b).

Two fixing brackets 

should be attached 

on the control end of 

the unit via the two 

upper hole positions. 

(see figure 2b).

 

 

 

 

 

 

 

 

 

 

Figure 2a. Mounting MRXBOX95-LOFT onto roof joists using the ‘L’ shaped fixing

brackets and AV mounts with four suitable screws on the long side of the unit. 

Spigot Location and Ducting references 

Spigot 1.

Extract air from kitchen/bathroom.

Spigot 2.

Intake air from outside. 

Spigot 3.

Outside air to house. 

Spigot 4.

Extract air to outside.

Washer Woodscrew

A. V. mount

Ceiling joist

Metal bracket

attached to unit

Higher and lower

mounting hole positions

Figure 2b. Side and front view example of 

an ‘L’ shaped fixing bracket and AV mount

attached to ceiling joist.

Side view

Front view

Summary of Contents for MRXBOX95-LOFT

Page 1: ...of the unit see figures 2a 2b and 2c for fixing details Lower the unit with the L shape fixing brackets attached onto the joists Mark through the brackets and drill four clearance holes into the top...

Page 2: ...move any burr and file if necessary to remove any external sharp edges Mark the socket depth on the pipe and check that the pipe section to be jointed is free of any surface damage which may affect th...

Page 3: ...ce MRXBOX95 LOFT Mechanical Ventilation with Heat Recovery Figure 4 Typical MVHR ducted arrangement for a loft mounted unit using the Nuaire condensation trap 125mm dia CONTRAP 125 2 3 Extract input a...

Page 4: ...FROM TOP Condensate Drain 21 5mm dia condensate drain 21 5mm dia condensate drain alternative position SIDE VIEW controls 3 0 Dimensions mm Figure 6 Figure 5 Main unit components shown with front and...

Page 5: ...bles or switched live cables should not be placed within 50mm of other cables or on the same metal cable tray as other cables 4 0 Electrical Connection Please note the electrical connection of the uni...

Page 6: ...re opened this includes no power supply at the unit c Data Cable installation A 4 core data cable is used to connect devices such as sensors to the fan and for interconnecting multiple fan units Do no...

Page 7: ...0 Maintenance Cleaning Please allow 300mm each side of the unit to allow access for maintenance purposes 1 Replace filters every 5 years Remove the top cover and slide out the two G4 filters fitted e...

Page 8: ...affected 3 2 When handling the equipment care should be taken with corners and edges and that the weight distribution within the unit is considered Lifting gear such as slings or ropes must be arrang...

Reviews: