NuAire AXUS SWIFT Series Installation And Maintenance Manual Download Page 7

7

nuaire.co.uk 

029 2085 8400

08. 11. 17. Leaflet Number  671645

Installation and Maintenance

AXUS Swift Circular Long Cased Axial Flow Fans

IMPORTANT

Isolation - Before commencing work, make sure that the 

unit, switched live and Nuaire controls are electrically 

isolated from the mains supply.

6.0 Maintenance

Only appropriately qualified personnel, familiar not only with the 
electrical aspect of the work but with the plant, area or application 
served by the unit, should carry out routine and preventative 
maintenance on this product.

Ensure all mechanical and electrical connections and fixings are secure 
and that inlet and outlet duct work is free of any obstruction or debris. 
Briefly switch the fan on/off to ascertain correct direction of rotation, 
compare the rotational label applied to the fan case and correct if 
necessary.

7.0 Replacement Of Parts

Should any component need replacing, Nuaire keep extensive stocks 
for quick delivery. Ensure that the unit is electrically isolated, before 
carrying out any work. 

When ordering spare parts, please quote the serial number of the unit 
and the ARC number of the purchase; if possible

 (This information will 

be available on the fan label).

8.0 Warranty

Axus AX units have a 3 year warranty. Units with Ecosmart control have 
a 5 year warranty. The warranty starts from the day of delivery and 
includes parts and labour for the first year. The remaining period covers 
replacement parts only.

This warranty is void if the equipment is modified without 
authorisation, is incorrectly applied, misused, disassembled, or not 
installed, commissioned and maintained in accordance with the details 
contained in this manual and general good practice.

The product warranty applies to the UK mainland and in accordance 
with Clause 14 of our Conditions of Sale. Customers purchasing from 
outside of the UK should contact Nuaire International Sales office for 
further details.

9.0 After Sales

For technical assistance or further product information, including spare 
parts and replacement components, please contact the After Sales 
Department.

6.1 Maintenance Intervals

Maintenance should be carried out on a regular basis, Nuaire 
recommend three months from commissioning and at least annually 
thereafter as determined by the operating conditions and levels of 
airborne contamination to which the unit is exposed.

6.2 Maintenance Check List 

a

6.3 Lubrication

Motors are fitted with sealed for life bearings and do not require any 
lubrication.

6.4 Impellers

Impellers are dynamically balanced during manufacture, no special 
treatment is required during maintenance, other to clean and remove 
all dust and dirt residue taking care not to disturb the balance weights. 
Remove stubborn dirt with warm soapy water – do not use caustic 
fluids.

If an ATEX compliant unit, observe the advice of the guidance notes 
in document 671216.

The maintenance programme must conform to ‘good custom and 
practice’ and to the published recommendations of associations such 
as the HVCA, CIBSE etc. The HVCA’s publication ‘Standard Maintenance 
Specification for Mechanical Services in Buildings’ Vol 2 Ventilating and 
Air Conditioning is a recommended reference.

Check that bird guards/safety grilles are secure
and free of obstruction.

Inspect all bolts, fixings and electrical terminals
for security.

Check motor for undue wear, signs of overheating
and apply winding insulation and continuity tests.

Remove all dust and dirt from impellers, be
especially careful not to disturb balance weights.

Generally clean.

Check resilient mounts and replace any that show
signs of wear or deterioration.

Telephone 02920 858 400 

[email protected]

Summary of Contents for AXUS SWIFT Series

Page 1: ...lso be referred to before handling and installation Any damages or deviations should be immediately reported to the seller supplier agent quoting the order and product details from the product rating...

Page 2: ...35 C up to 85 relative humidity The controller must be fitted to a vertical vibration free wall with appropriate fasteners and for ease of installation the cover should be removed and the casing separ...

Page 3: ...L Control SPCON 460V 3 phase 60Hz supply 380V 3 phase 60Hz supply 400V 3 phase 50Hz supply L1 L2 L3 STAR L1 U1 L2 V1 L3 W1 Link W2 U2 V2 U1 V1 W1 W2 U2 V2 L1 L2 L3 400V 3 phase 50Hz supply 380V 3 phas...

Page 4: ...kle Test 1 0 Pwr Standby Fan 1 Fan 2 Heating Cooling Fault Frost Tx Rx Ecosmart Earth DAMPER FAULT RUN E L3 N L2 L1 E N L1 L2 L3 Mains supply connections 400V 50Hz 3ph Neutral via local isolator 1 3 5...

Page 5: ...creened cable with the screening grounded at one end only preferably at the inverter end 4 4 10 BMS Input Signals The BMS connection is made with a plug in connector via the socket see fig 11 To ensur...

Page 6: ...sired airflow Remove the link wire if not required fig 7 5 3 2 Setting The Minimum Trickle Airflow Rate Nomial 20 Repeat the same procedure as for maximum airflow above but without the link wire betwe...

Page 7: ...UK mainland and in accordance with Clause 14 of our Conditions of Sale Customers purchasing from outside of the UK should contact Nuaire International Sales office for further details 9 0 After Sales...