V
ent and Air-Intake Pipe Length Determination
Use Table 3-4 to determine the maximum pipe length that can be used. The table calculates sweep, 90º elbows, and 45º elbows at
5 equivalent feet [1.52 m] each. Note: models Ti150-200 have limitations when operating with Propane Gas (LP).
Example
:
A Ti200 can be installed with 105 equivalent feet [32 m] of air-intake piping and 105 equivalent feet [32 m] of vent
piping when operating with Natural Gas. When operating with Propane Gas (LP), the maximum vent length in equivalent feet is
limited to 50’ (3” pipe).
The length of one vent pipe (intake or exhaust) may not exceed the length of the other vent pipe by
more than 20 equivalent feet (6.1 m).
Table 3-4 Allowable Vent and Air-Intake Pipe Size and Lengths
Model
Pipe Size
Gas
Length
ft. [m]
Number of Elbows (90’s or 45’s) and Equivalent Feet [Meters]
1
2
3
4
5
6
7
8
9
Ti150
Ti200
3”
LP
50
[15.2]
45
[13.7]
40
[12.2]
35
[10.7]
30
[9.1]
25
[7.6]
20
[6.1]
15
[4.6]
10
[3.0]
5
[1.5]
3”
NG
105
[32]
100
[30.5]
95
[28.9]
90
[27.4]
85
[25.9]
80
[24.4]
75
[22.9]
70
[21.3]
65
[19.8]
60
[18.3]
4”
NG
& LP
105
[32]
100
[30.5]
95
[28.9]
90
[27.4]
85
[25.9]
80
[24.4]
75
[22.9]
70
[21.3]
65
[19.8]
60
[18.3]
Ti100
3” or 4”
NG
& LP
105
[32]
100
[30.5]
95
[28.9]
90
[27.4]
85
[25.9]
80
[24.4]
75
[22.9]
70
[21.3]
65
[19.8]
60
[18.3]
Termination Options
The venting system of the Trinity Ti may be terminated using field supplied piping to construct a “Two-Pipe” termination, see
Figures 3-3, 3-4a, 3-6, 3-9, 3-10 and 3-11. Alternatively, the venting may be terminated used a factory kit, either “Concentric”
(see Figures 3-2, 3-4b, 3-5 and 3-7) or “Low Profile” (see Figure 3-8). The Concentric Vent Termination Kit can be either Roof
or Sidewall terminated, while the Low Profile Termination Kit may only be Sidewall terminated. See Table 3-5 for details on the
optional termination kits.
Venting Options -
Due to potential moisture loading (build-up) along the exterior wall, sidewall
venting may not be the preferred venting option. See Figs 3-2(b) and 3-3(b).
Optional Termination Kits
Kits certified with the Trinity Ti are listed in Table 3-5 and available from IPEX and/or NTI. For more information on System 636
Concentric Vent Kits or wholesaler locations contact IPEX directly.
USA:
1-800-463-9572 or www.IPEXamerica.com
│
CAN:
1-
866-473-9462 or
www.ipexinc.com
.
Table 3-5 Optional Vent Termination Kits
NTI
P/N
IPEX
P/N
Description
1,2,4
Vent Kit
Material
Kit
Connection
Vent Option
Roof
Wall
82666
196116
Concentric Vent Termination Kit (CAN)
4,5
ULC
S636
PVC
3"
84355
196021
4"
n/a
197009 Concentric Vent Termination Kit (CAN)
4,5
ULC
S636
CPVC
3"
84357
196985 Low Profile Termination Kit
(Flush Mount)
PVC
3"
84358
196986
4"
Notes:
1
Instructions included with termination kits contain more detailed assembly and installation instructions.
2
Clearance requirements in this manual supersede those of the instructions included with the vent terminal.
3
Terminal
MUST
be cemented together and to the vent pipes during installation.
4
Certified to ULC S636.
5
Vent Screen provided with boiler may be used with the IPEX Concentric Vent Kits; otherwise use IPEX vent screens (3"
vent screen P/N 196051; 4" vent screen P/N 196052).