2
INDEX
1
TECHNICAL INSTALLATION INSTRUCTIONS
3
2
MAIN DIMENSIONS
3
3
TECHNICAL DATA
3
4
INSTALLATION
5
4.1.
PLACE OF INSTALLATION
5
4.2.
ELIMINATION OF COMBUSTION RESIDUES
5
4.3.
CONNECTION TO THE GAS INSTALLATION
5
4.4.
OPERATION CONTROL
6
5.
TECHNICAL MAINTENANCE
6
6.
INSTRUCTIONS FOR REPLACEMENT OF COMPONENTS
7
6.1.
PARTS LIST
7
6.2.
REPLACEMENT OF THERMOCOUPLE
7
6.3.
REPLACEMENT OF PILOT BURNERS
7
6.4.
REPLACEMENT OF THERMOELECTRIC SECURITY VALVE
7
7.
GAS CONVERSION
7
7.1.
REPLACEMENT OF BURNER INJECTOR
8
7.2.
ADJUSTMENT OF PILOT BURNER TO NEW GAS TYPE
8
7.3.
PRIMARY AIR REGULATION
8
7.4.
BURNER REGULATION
9
8.
PROBLEMS AND SOLUTIONS
9
9.
USE AND MAINTENANCE INSTRUCTIONS
9
9.1
START-UP
9
9.1.1.
SWITCHING ON THE BURNER
9
9.1.2.
SWITCHING OFF THE BURNER
9
10.
TECHNICAL MAINTENANCE
10
11.
EC CERTIFICATE
11
Summary of Contents for HQ-04
Page 1: ......