40
BA_v2_eagle_parallel_EN_1-0
M
ainTenance
anD
seRvice
6
Make sure that in particular the measurement surface with the inductive coil and the three
optical sensors [
1
] and the runway [
] on the flight deck are clean. In case
these areas are not clean, repeat steps 4 and 5 and check again for cleanliness.
7
Close flight deck and press closing device
2
] so that the flight deck audibly clicks
into place.
8
Reconnect the machine to the mains supply.
1
Fig. 14:
Opening and closing the flight deck of the coin validator
2
Fig. 15:
Areas and parts to be cleaned in the measurement and validation area
1
2
Summary of Contents for v2 eagle
Page 2: ......