NPC NHE Series Product Instruction Manual Download Page 7

 

 

 

防護罩進風口和出風口開孔率應大於

60%, 

以確保足夠的迴圈風量,這對於延

長熱交換器的使用壽命和減少維護頻率非常的重要。

 

 

防護罩的進出風口應該防止氣流短路

,

以便熱交換器可以獲得最佳的冷卻效果。

 

Attention: 

a) Heat exchanger does not need a cowling; Customers can put a cowling 

outside unit according to themselves. The cowling can be made by customer self. 

b) Shield inlet and outlet opening rate should be greater than 60%, To ensure 

enough circulation heat exchanger volume. This is very important to have the 
heat exchanger running with long lifetime and less service. 

c) When you make a cowling design/installation, make sure the inlet heat 

exchanger and outlet heat exchanger not been short cut, this is also critical to 
keep unit have best cooling performance. 

 

4.3 

熱交換器安裝

  Heat Exchanger Conditioner Installation 

安裝步驟:

 

1. 

在安裝面上畫出櫃門開孔示意圖,將空白部分切割掉。不同型號熱交換器的櫃

門開孔示意圖請參考相應規格書。

 

2. 

根據安裝示意圖中示意的方向,將熱交換器安裝在機櫃上。

 

Installation steps: 

1. Draw a schematic diagram of the cabinet door opening on the installation 

surface and cut off the blank part. Please refer to the corresponding 
specifications for the door opening diagrams of different types of heat 
exchangers. 

2. Install the heat exchanger on the cabinet according to the direction 

indicated in the installation diagram. 

 

Summary of Contents for NHE Series

Page 1: ...NHE NHE Series Heat Pipe Heat Exchanger Product Instruction Manual Nakano Precision Co Ltd...

Page 2: ...intenance and other information of the NHE series heat pipe heat exchangers It is mainly used to guide users to install and maintain this series of products Any operation for this series of products m...

Page 3: ...power supply range 220VAC 15 50Hz 60Hz 1 2 Conform to the standard Standard Description GB T 17626 7 1998 Electromagnetic compatibility EMC GB4706 1 Safety household and similar electrical appliance G...

Page 4: ...2 1 Figure2 1 Packing mark During Handling or transport Heat exchanger must be upward placed as It is strictly forbidden to invert lay flat over tilt and collide The heat exchanger is a precision inst...

Page 5: ...box is placed upright as shown in Figure 2 1 Please check whether the packing belt is broken or the carton is broken deformed or damp Use scissors or a knife to remove the packing strap and remove the...

Page 6: ...efore installation a Phillips screwdriver a flat blade screwdriver a sealing tape and a vise 4 2 Schematic of Installation The heat exchanger installation is as following picture 4 1 4 2 Figure 4 1 Fr...

Page 7: ...make a cowling design installation make sure the inlet heat exchanger and outlet heat exchanger not been short cut this is also critical to keep unit have best cooling performance 4 3 Heat Exchanger C...

Page 8: ...iveness and ambient temperature exceeding 70 C and humidity exceeding 95 2 Ensure that the inclination of the product after installation is not more than 3 3 Ensure that the control cabinet is well se...

Page 9: ...seness If you find that the power cord is loose or lose you should re fasten the power cord with a tie use a screwdriver to tighten the loose screws 2 Voltage Stability Use a multimeter to measure the...

Page 10: ...9 12...

Page 11: ...overed by our warranty The product has exceeded the warranty period The factory number of the product cannot be provided please refer to the nameplate posted on the body Failure due to operation in ab...

Page 12: ...249 Guanhai Blvd Bali Dist New Taipei City 249005 Taiwan R O C TEL 886 2 8630 5771 FAX 886 2 8630 5775 Email info npc ice com http www npc ice com 2021 08 User Name Model Name Serial Number Manufactur...

Reviews: