www.flexco.com
—12—
Aero Stand Assembly
A11
Cut the plastic ties that are holding the three cables looped and hanging
from the top beam assembly. Inside the column assembly, ensure that the
weights are secured with the weight latch.
Follow the cables from the pulley located in the top beam from the back
side of the Aero Stand assembly for proper positioning. Fix the cables to
the weight system using the provided quick link clevises.
The cable that runs through the center groove of the pulley should be
fastened to the center clevis, the cable in the left groove in the left clevis,
and the right groove to the right clevis. Take care not to cut, kink, or twist
cables. After the cables are installed, ensure that the quick link nuts are
secured to close the link.
Cut zip ties that are fastened to the three cables in the top beam assembly,
allowing them to hang freely.