- 5 -
Ⅱ
.
Detailed
Operat
ing
Instructions:
HOWTO USE:
1. Installation of the unit: Lift the heating unit out of the wooden packing base after you open the
package; place it flat in a spacious position; check whether the unit is damaged during transportation;
after you confirm that it has no mistake, please push it flat to the installation position and ensure that it
is stable.
(1) Please be sure to check whether the clamp or flange bolts of the external hose are tightened. After
the
liquid
is
added,
please
observe
whether
there
is
water
leakage
at
the
pipe
joint.
If
there
is
water
leakage,
please
deal
with
the
problem
in
time.
(2)
After
it
is
well
placed,
please
wipe
the
inner
and
outer
surfaces
of
the
container
gently
with
a
wet
cloth
to
remove
the
protective
oil
and
keep
the
container
clean.
2.
When
you
use
the
unit,
please
fix
it
on
a
fixed
platform
and
open
the
valve
of
the
water
inlet.
Then,
inject
clean
water
into
the
box
(in
order
to
shorten
the
heating
time,
warm
water
can
also
be
added).
After
water
is
added,
please
close
the
water
inlet
valve
.
3.
Connect
the
power
supply
and
turn
on
the
switch;
set
constant
temperature
according
to
detailed
operations
of
the
thermostat
(refer
to
the
following
instructions
).
4.
After
the
unit
is
heated
and
had
constant
temperature
set
,
please
dip
the
hot
pack
into
water
and
hang
it
on
columns
at
both
ends
of
the
separation
frame.
5.
When
taking
out
the
moist
heat
pack
from
the
unit,
please
use
the
clamps
configured
by
the
unit.
Do
not
do
operations
with
bare
hands
so
as
to
avoid
being
scalded.
Detailed
operati
ng
instructions
o
n the
temperature
controller:
(1)
Panel
I
nstruction: