You need to have the data model that you completed in the analysis and design phases. You should
also have a proposed record matching and data format strategy defined in order to prepare the data
correctly. With the data model and format strategy defined, you can:
Create production data sets appropriate for loading into the Identity Vault (as identified in the
analysis and design activities). This includes the likely method of loading (either bulk load or
via connectors). The requirement for data that is validated or otherwise formatted is also
identified.
Identify performance factors and validate these factors against equipment being used and the
overall distributed architecture of the deployment of Identity Manager.
After the data is prepared, proceed to
Section 2.5, “Production Pilot,” on page 24
.
2.5 Production Pilot
The purpose of this activity is to begin the migration into a production environment. During this
phase, there might be additional customization that occurs. In this limited introduction, the desired
outcomes of the preceding activities can be confirmed and agreement obtained for the production
rollout. The pilot validates the plan that has been created to this point in the process.
NOTE:
This phase might provide the acceptance criteria for the solution and the necessary
milestone en route to full production.
The pilot solution provides live proof of concept and validation for the data model and desired
process outcomes. After the pilot is completed, proceed to
Section 2.6, “Production Rollout
Planning,” on page 24
.
2.6 Production Rollout Planning
This phase is where the production deployment is planned. The plan should:
Confirm server platforms, software revisions, and service packs
Confirm the general environment
Confirm the design of the Identity Vault in a mixed coexistence
Confirm that the business logic is correct
Confirm that the data synchronization is occurring as planned
Plan the legacy process cutover
Plan a rollback contingency strategy
The plan needs to contain implementation and completion dates for each step in the rollout. Each
stakeholder provides input for these dates and agrees that these dates work for them. This allows
each person involved in the rollout to know when the changes are coming and when they should be
completed.
With the production rollout plan completed, proceed to the
Section 2.7, “Production Deployment,”
on page 25
.
Summary of Contents for IDENTITY MANAGER 3.6.1
Page 4: ...4 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 12: ...12 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 14: ...14 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 26: ...26 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 38: ...38 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 54: ...54 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 68: ...68 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 70: ...70 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 72: ...72 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 74: ...74 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 94: ...94 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 96: ...96 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 98: ...98 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 100: ...100 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 102: ...102 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...
Page 104: ...104 Identity Manager 3 6 1 Installation Guide novdocx en 17 September 2009 ...