NOVATECH ApS - Skudehavnsvej 30 - DK 9000 Aalborg. P.O.Box 540
Tel. +45 98 16 50 09 Fax +45 98 16 80 97 [email protected]
28
7.6.
Maintenance schedule
Table 5. Maintenance schedule
7.7.
General safety
Crushing hazard
During service operations, you must bear in mind that the Roll trailer may move
unexpectedly. Do not go below the trailer if it is not correctly supported and all of its tires
are not resting firmly on the ground.
Waste handling
Dispose of hazardous waste such as waste oil, fluids and grease according to your company's
regulations.
8.
Spare parts
Spare parts according to table 6:
Table 6. Spare parts drawings list
Daily
Weekly
Monthly
Every 6
months
Yearly
Operators daily
check
Extensive visual
check for damage
Bolts in suspension
check for correct
tightening torque
Axles bushing
replacement*
Axle bearing
replacement*
Tyre condition
Landing leg
*-depends on usage
Nr.
Description
Drawing/Item No
Rev.
1
General RT spare parts
11.569.00.SP
0
2
Wheel pair spare parts
11.569.03.00_WP_22x16x16.SP
0