E
N
G
LI
S
H
6
PARTS & ASSEMBLY
Read assembly instructions carefully before installing the KEGORATOR.
Once the unit is laid on its back, the coolant in the refrigeration unit is shifted. The
coolant in the refrigeration unit needs to stabilize before the power is turned on.
Allow the kegorator to stand in an upright position for about 8 hours before turning
on the power. Allow unit to cool for at least 12 hours before purchasing a keg.
CO2 Tank
Band
2.5lb CO2
Tank
Keg
Coupler
Regulator
Tap Tower
Washers (2)
Railing
Tap tower
Handle
CO2 Hose
Tap Tower Nut
Casters (2 with Locking
Mechanism, 2 without)
Drip Tray
Hose
Clamps (3)
Tap
tower
hose
Wrench tool