
57
Assembly Instructions
Tools Needed
13mm Wrench
(2 Needed)
Torque Wrench
Step 14 – Throttle Cable Setup
Step 14 only applies to Models 110900 and 1131
One end of the throttle cable is connected to the engine. Route
unattached end of cable from engine downward towards engine mount
bracket. Ensure cable routes thru the hose guide.
There is (1) crimped clamp secured on the cable and (1) vinyl coated
clamp that is free moving on the cable.
Insert bolt thru the crimped clamp that attaches the cable to the engine
mount bracket. Secure with nut.
Torque to 21 ft.-lb.
Vinyl coated loop clamp will be connected to engine guard bolt in a
future step.
Fasteners Needed from Parts Bag:
Engine Throttle Clamp
to Engine Mount
Flange Bolt
Qty 1
Engine Throttle Clamp to
Engine Mount
Flange
Nut
Qty 1
Hose Guide
Engine/Pump
Throttle Cable
Tow Bar
Engine Mount Bracket
Crimped Clamp
Bolt and Nut
Summary of Contents for M110800F.4
Page 2: ...2 Hazard Signal Word Definitions...
Page 7: ...7 Safety Label Locations 13 14 12 15...
Page 30: ...30 Parts Breakdown Exploded View 110800 110900 1131 Rev F 4...
Page 71: ...71 This page has intentionally been left blank...
Page 72: ...72 Manufactured by Northern Tool Equipment Co Inc Burnsville MN 55306 NorthernTool com...