RLC Installation and Administration Guide
51
June 2005
Planning for RLC installation
Checklists
Use the RLC Installation Checklist on page 52 as a guide to ensure complete
RLC installation and configuration.
Appendix A, “Planning forms”, contains the following forms for you to record
and store your configuration plans:
Connection Information—16 ports
Connection Information—32 ports
Online/Offline Table Configuration
Refer to “Related information products” on page xxii for information on
accessing these forms online.
Taking inventory
After you unpack and visually inspect the equipment, verify that you have all the
equipment at the site before beginning installation. Check the equipment you
received against the shipping documents. Report any shortages to your Nortel
customer support representative immediately.
Installation checklist
When you are preparing to install your Remote Gateway 9100 Series system,
use the checklist on following pages to ensure that you complete all the required
processes properly.
Summary of Contents for RLC
Page 2: ......
Page 4: ......
Page 6: ...vi RLC Installation and Administration Guide Publication history Standard 4 0 ...
Page 16: ...xvi RLC Installation and Administration Guide Contents Standard 4 0 ...
Page 26: ...xxiv RLC Installation and Administration Guide About this document Standard 4 0 ...
Page 102: ...76 RLC Installation and Administration Guide Planning for RLC installation Standard 4 0 ...
Page 132: ...106 RLC Installation and Administration Guide Installing the RLC Standard 4 0 ...
Page 262: ...236 RLC Installation and Administration Guide Configuring the RLC Standard 4 0 ...
Page 376: ...350 RLC Installation and Administration Guide Planning forms Standard 4 0 ...
Page 402: ...376 RLC Installation and Administration Guide Sample configuration files Standard 4 0 ...
Page 448: ...422 RLC Installation and Administration Guide Fields Index Standard 4 0 ...
Page 465: ......