![Nortel CVX 600 Hardware Installation Manual Download Page 70](http://html1.mh-extra.com/html/nortel/cvx-600/cvx-600_hardware-installation-manual_1707338070.webp)
Connecting Power to the Chassis
2-26
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
CVX 600 Hardware Installation Guide
Next Step
To apply power, see “
Applying Power to the CVX 600”
on
page 2-42
.
2
Insert the power cords into the receptacles labeled “AC PM2” and “AC PM1.”
3
Insert the other ends of the power cords into the AC power receptacle.
Step
Action
AC PM 1
AC PM 2
1
2
3
4
5
6
System
Contr
oller
only
1
2
3
4
5
6
Main Chassis
DC PM 2
DC PM 1
DS3
E 1 x 12
DS1 x 12
Tx
Rx
Cloc
k
Cloc
k
12
11
10
9
8
7
12
11
10
9
6
5
4
8
7
6
5
3
2
1
4
3
2
1
System Redundant
CVX-0206B
AC power cords
HSSI
2
Visual
Alarms
A
udib
le
Crit
Ret
Maj
Ret
Min
Ret
Crit
Ret
Maj
Ret
Min
Ret
RX
Link
10/100 Enet
1
RX
Link
10/100 Enet
3
RX
Link
10/100 Enet
Console
CVX-0230A
Connect to a grounded 20 A
power source (100 to 240 VAC).
AC power cord
(North America: 120 V at 20 A)
(Europe: 240 V at 10 A)