![Nortel CVX 600 Hardware Installation Manual Download Page 111](http://html1.mh-extra.com/html/nortel/cvx-600/cvx-600_hardware-installation-manual_1707338111.webp)
Replacing Modules and Filler Panels
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
3-13
Replacing CVX 600 Components
3
Grasp the left and right ejector levers and pull them outward to eject the
SCC-SM. You will feel the SCC-SM disconnect from the chassis mid-plane
and the SCC-LTM or SCC-RLTM.
4
Grasp the ejector levers and carefully slide the SCC-SM out of the chassis.
Step
Action
CVX-0150C
Open ejectors
System
Pwr
Good
Fail
Redun
3
2
1
RESET
PCMCIA
1
2
AC PM
AC PM
Fans
1
2
3
4
5
6
CVX-6oo
BIP
BIP
System
Po
w
e
r
Good
F
ailed
Redun
Ether
net
HSSI
1
3
2
1
Reset
PCMCIA
12
AC PM 1
AC PM 2
PDU 2
PDU 1
ESD
Jack
O
I
O
I
CVX-0151B
Modem/ISDN
Pwr
Good
Fail
Redun
Modem/ISDN
Pwr
Good
Fail
Redun
Modem/ISDN
Pwr
Good
Fail
Redun
D
AC DS1x24
Pwr
Good
Fail
Redun
YEL
RED
YEL
RED
3
1
10
11
24
2
12
22
23
21
19
20
18
16
17
15
13
14
9
7
8
6
4
5
System
Pwr
Good
Fail
Redun
10/100 Enet
3
2
1
HSSI
RESET
PCMCIA
1
2
System
Pwr
Good
Fail
Redun
10/100 Enet
3
2
1
HSSI
RESET
PCMCIA
1
2