
48
WLAN Cable Access Point 6220 NTPM99CA 01 Rel 1.0 Issue 3 Dec 2004
Procedure 1-5
Grounding APU enclosure
Action
Step Action
1. Loosen the grounding bolt and wind the end of the ground wire around
the bolt.
2.
Fasten the bolt and the ground wire to the earth by connecting them to
the earth facility.
Figure 3-23
Assembling the grounding bolt and wire
Figure 3-24
Concept diagram of APU enclosure grounding