Installing and Operating Passport ARN Routers
1-22
114200-E Rev 00
To connect X.25 PAD services:
1.
Position the X.25 breakout box above the ARN in one of the following
ways:
•
Attach the rubber feet that came in the shipping container to the four
raised areas on the bottom of the breakout box chassis; then, place the box
on top of the ARN (
Figure 1-18
).
•
Using the screw holes on the sides of the breakout box, install the box
above the ARN in a standard equipment rack. For information about
rack-mounting the ARN, see “Rack-Mounting the ARN” on
page 1-6
.
2.
Connect the DB-60 cable on the breakout box to the X.25 PAD connector
on the installed module (
Figure 1-18
).
Figure 1-18.
Connecting a Breakout Box to the X.25 PAD Interface
3.
Connect the appropriate WAN cabling to each of the eight DB-25
interfaces on the breakout box that you will use.
For information on cables available from Nortel Networks, see the
Cable
Guide
.
ARN0088A
COM3
COM4
COM5
Serial
COM
TX
RX
RLSD
Run
Boot
Fail
Pwr
RPS
Fan
Base
Adapter1
Adapter2
Expansion
DCM
PCMCIA
Advanced Remote Node
RLSD3
RLSD4
RLSD5
1
2
Serial
Tx
Rx
Cl
Tx
Rx
Cl
10BaseT
AUI
Ethernet 1
10BaseT
AUI
Ethernet 2
X.25 PAD
DB-60 cable
DB-25 connector ports