background image

5

3. COIL INSTALLATION

 WARNING:

Electric furnaces may be connected to 
more than one supply circuit.

Upflow Furnace —

1.  Disconnect  all  electrical  power  to  the 

furnace.

2.  If needed, use one of the coil case adapter kits 

to match the coil to the furnace air discharge 

opening.  Refer  to  the  Coil  Specifications 

Section for proper kit numbers.

3.  Install  the  coil  and  level  it  as  needed  to 

ensure proper condensate drainage. (See 

Figure 2)

4.  Seal the enclosure as required to minimize 

air leakage.

5.  Connect the refrigerant lines as outlined in

 

the Refrigerant Lines section.

Downflow — 

These coils may be installed in 

downflow applications. Installation of the coils in 

these applications only require that the furnace 
and coil cabinets are securely mounted together 

before setting in place. Fossil fuel applications 

require coil to be placed in the supply air stream 
only.

Horizontal —

 Standard coils may also be 

installed  in  horizontal  applications.  Installation 

of the standard coils in these applications 
only require that the furnace and coil cabinets 
are securely mounted together and that a 

horizontal drain pan kit be installed. Refer to the 

Specifications Section for proper kit numbers.

To Configure Horizontal Ready Coils for 
Horizontal LEFT Installations:

1)  Remove the coil access door.

2)  IMPORTANT: Remove the plug from one of 

the threaded holes in the horizontal drain 
pan. Completely remove the webbing located 
in the threaded holes of the horizontal drain 
pan. If webbing is not removed, the drain will 

not function properly and ceiling damage 
may occur.

3)  Insert a plug (from the horizontal drain pan) 

into the open and unused drain hole in the 
drain pan at the bottom of the unit to block 
bypass air.

4)  Remove the corresponding drain line 

knockout from the coil access door to allow 
access to the horizontal drain.

5)  Replace the door.

NOTE: 

Install drainpan extension (supplied) on 

the following models:
C5BH-*60 

C4BH-X36

C5BH-*49 

C4BH-X48

 

 

C4BH-X60

To Configure Horizontal Ready Coils for 
Horizontal RIGHT Installations:

1)  Remove the coil access door. Unscrew the 

line-set tube close-off plate from the front 
left cabinet rail.

2)  Slide the coil and drain pan assembly out 

of the unit.

3) 

IMPORTANT: 

Remove the plug from one of 

the threaded holes in the horizontal drain 
pan. Completely remove the webbing located 
in  the  threaded  holes  of  the  drain  pan.  If 
webbing is not removed, the drain will not 

function properly and ceiling damage may 
occur.

4)  Remove the sheet metal hairpin covers 

(if supplied) from the back of the coil and 
discard.

5)  Place  the  horizontal  drain  pan  on  the 

opposite  side  of  the  coil.  On  units  with  2 

sets of knockouts, remove the other set of 
knockouts in the coil spacing plates and 
insert support rod.

6)  Insert a plug (from the horizontal drain pan) 

into the open and unused drain hole in the 
drain pan at the bottom of the unit to block 
bypass air.

7)  Slide the coil and the horizontal drain pan 

assembly back into the unit. Reattach the 
tube close off plate.

Figure 2. Upflow Furnace Application 

Summary of Contents for C5B

Page 1: ...tionsand orfurnace air handler markings before proceeding with installation of the coil These instructions are primarily intended to assist qualified individuals experienced in the proper installation...

Page 2: ...izontal Furnace Horizontal Ready Coils for Horizontal Left Installation Horizontal Ready Coils for Horizontal Right Installation 4 Verify Pressurization 6 5 Refrigerant Line Connections 6 6 Completing...

Page 3: ...tdoor unit NOTE Some coils employ a thermostatic expansion valve TXV as the metering device See page 4 H 20 3 4 B 16 5 8 W A 3 4 133 8 155 8 19 3 4 Figure 1 3 Wherepreciseformingoftherefrigerantlines...

Page 4: ...63 913963 913963 913964 913964 913964 Extra Orifice in N A 0 053 for 1 5 ton condenser N A N A 0 053 for 1 5 ton condenser N A N A N A N A N A N A N A N A Coil Model 1 C5BA H T X24C A C5BA H T25C A C5...

Page 5: ...the threaded holes of the horizontal drain pan If webbing is not removed the drain will not function properly and ceiling damage may occur 3 Insert a plug from the horizontal drain pan into the open a...

Page 6: ...id direct face exposure or contact with valve when gas is escaping Always ensure adequate ventilation ispresentduringthedepressurization process Any uncertainties should be addressed before proceeding...

Page 7: ...ends of the lines must be round clean and free of any burrs 13 Place grommets in proper orientation onto line set with sufficient distance to braze joint 14 Insert the line set tubes into the coil tub...

Page 8: ...coil case and furnace that were previously removed to install the indoor coil Refrigerant Charging These cased indoor coils are not factory charged with refrigerant It will be necessary to evacuate th...

Reviews: