
10-10
Page 26
2008-12-03
Figure 7. Mounting Process – Step 7
The air gap between the outermost vertical supports and the duct walls as well as between the
front bracket and the duct ceiling must be sealed using EPDM sealing profile (accessory). Cut the EPDM
sealing profiles to the desired length (channel height and channel width plus cm allowance). Fix the
EPDM sealing profiles to the outermost vertical supports and to the front bracket using the clamping
brackets and self-tapping screws #10 x 3/4" supplied. Tailor the EPDM sealing profiles to the duct height
and the duct width, then fix them to the duct walls and the duct ceiling using the clamping brackets and
self-tapping screws #10 x 3/4" supplied (number of self-tapping screws to be used as required).
Note: In place of the EPDM sealing profiles also sheet metal angles of stainless steel (not included
in the delivery) may be used for the sealing.
Summary of Contents for MH Series
Page 1: ...2544832 A MH Series EVAPORATIVE HUMIDIFIER COOLER Installation Manual TM ...
Page 5: ...10 00 Page 1 2008 12 03 10 00 INTRODUCTION ...
Page 21: ...10 10 Page 17 2008 12 03 10 10 INSTALLATION ...
Page 37: ...10 20 Page 33 2008 12 03 10 20 PLUMBING ELECTRICAL INSTALLATION ...
Page 42: ...10 20 Page 38 2008 12 03 1 3 3 Wiring Diagram Nortec MH Flow Figure 7 Wiring Diagram MH Flow ...
Page 44: ...10 20 Page 40 2008 12 03 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 45: ...10 30 Page 41 2008 12 03 10 30 OPERATION ...
Page 48: ...10 30 Page 44 2008 12 03 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 49: ...10 40 Page 45 2008 12 03 10 40 MAINTENANCE TROUBLESHOOTING ...