6
6.
Installation Clearances
Before installing, check for the following:
Install in accordance with relevant building and mechanical codes, as well as any local, state or
national regulations, or in the absence of local and state codes, to the National Fuel Gas Code
ANSI Z223.1/NFPA 54 – latest edition. In Canada, see the Natural Gas and Propane Installation
Code CSA B149.1 - latest edition for detailed requirements.
WARNING
Item
Check
• When installing the unit on a balcony, etc., secure an
evacuation route of 24" (600mm) or more in width.
• Provide clearance of 24" (600mm) or more in front of
the unit to facilitate inspection and repair. Do install the
unit in a location where the unit is out of reach, such as
the wall of the second floor.
• When installing the unit in a common side corridor, provide
a clearance of 47" (1,190mm) or more in front of the unit.
• Set the bottom edge of the exhaust port about
84" (2,130mm) from the corridor floor.
Handrail
common side
corridor
balcony, etc.
Handrail
about 84"
(2,130mm)
• Maintain the following clearance from both combustible
and non-combustible materials.
24" (600mm)
or more
36" (900mm)
or more
Surrounding the area of installation
24" (600mm)
or more
47" (1,190mm) or more
Required Clearances From Heater
Illustration
6" (150mm)
or more