background image

9

appliances drawing combustion air from that space.  Furnace
closets, small equipment rooms and garages are confined
spaces.  Furnaces installed in a confined space which
supply heated air to areas outside the space must draw
return air from outside the space and must have the return
air ducts tightly sealed to the furnace.  

A confined space

must have two openings into the space for combustion
air.  One opening must be within 12 inches of the
ceiling, and the other must be within 12 inches of the
floor

. The required sizing of these openings is determined

by whether inside or outside air is used to support
combustion, the method by which the air is brought to the
space, and by the total input rate of all appliances in the
space.

Downflow Warning (*RK Models):

The design of the downflow furnace is certified for natural
or propane gas and for installation on non-combustible
flooring.  A special combustible floor sub-base is required
when installing on a combustible floor.  Failure to install the
sub-base may result in fire, property damage and personal
injury. The special downflow sub-bases are factory sup-
plied accessories, part numbers 902677 and 902974.
When the furnace is installed on a factory or site-built cased
air conditioning coil, the sub-base is not necessary. How-
ever, the plenum attached to the coil casing must be
installed such that its surfaces are at least 1" from
combustible construction.

!

 CAUTION:

The downflow sub-base must not be installed
directly on carpeting, tile, or any combustible
material other than wood flooring.

A gas-fired furnace installed in a residential garage must be
installed so the burners and the igniter are located not less
than 18 inches (457 mm) above the floor, and the furnace
must be located or protected to avoid physical damage by
vehicles.

!

 WARNING:

Do not place combustible material on or against
the furnace cabinet or within 6 inches of the
vent pipe.  Do not place combustible materials,
including gasoline and any other flammable
vapors and liquids, in the vicinity of the furnace.

Figure 2. Horizontal installation on a Platform

Gas Inlet

Electrical 

Supply 

Connection

Coil Plenum

Type “B” Vent

Combustible
Platform

Louver Door

Note: Line 
Contact is Permissible 

Supply Air Plenum Installation

A. Installation on a concrete slab. - *RK

1. Construct a hole in the floor per the dimensions in

Figure 2.

2. Place the plenum and the furnace as shown in  Figure

3.

B. Installation on a combustible floor. - *RK

1. Cut and frame the hole in the floor per the dimensions

in Figure 4.

2. Place sub-base for combustible floors over the hole

with its duct collar extended downward. Attach the
supply air plenum to the base in a manner which will
assure 1" clearance to the flooring or other combus-
tible construction. Place furnace on the combustible
base as shown in Figure 6.

3. When a factory or site built cased coil is provided

beneath the furnace the sub-base for combustible
floors is not necessary. However, the plenum at-
tached to the cased coil must be installed such that its
surfaces are at least 1" from the flooring or other
combustible construction.

Horizontal Furnace Installation
This furnace can be installed horizontally in an attic,
basement, crawl space or alcove. It can be  suspended
from a ceiling in a basement or utility room in either a right
to left airflow or left to right airflow. (See Figure 2.)

If the furnace is to be suspended from the ceiling, it will be
necessary to use steel straps around each end of the
furnace. These straps should be attached to the furnace
with sheet metal screws and to the rafters with bolts. The
furnace could also be suspended by an angle iron frame
bolted to the rafters.

Summary of Contents for 060C-12

Page 1: ...assist qualified individuals experienced in the proper installation of this appliance Some local codes require licensed installation service personnel for this type of equipment Read all instructions...

Page 2: ......

Page 3: ...er Venting 17 Location of Outdoor Terminations 17 Horizontal Installation 17 Flexible Vent Systems 19 Circulating Air Supply 19 20 General 19 Return Air 19 Gas Supply and Piping 20 22 General 20 Leak...

Page 4: ...Air Opening Bottom 7 8 FURNACE SPECIFICATIONS Upflow Horizontal Models Figure 1a Upflow Unit Dimensions Table 1a Upflow Furnace Dimensions and Shipping Weights Furnace Dimensions Shipping Model Input...

Page 5: ...Bottom Opening Bottom Opening 10 1 4 24 1 2 19 3 4 Table 1B Downflow Furnace Dimensions and Shipping Weights Model Furnace Shipping Number Input A B C Weights RK Btuh inches inches inches lbs 060C 12...

Page 6: ...880 0 0 1 0 650 945 1 0 0 1 720 1050 1 0 0 0 800 1155 1 0 1 0 900 1305 0 1 0 1 1000 1450 0 1 0 0 1060 1530 1 1 0 1 1100 1595 0 1 1 0 1170 1700 1 1 0 0 1290 1870 1 1 1 0 CFM SWITCH NUMBER 2 TON 3 5 TON...

Page 7: ...publications are available from National Fire Protection Association Inc Batterymarch Park Quincy Massachusetts 02269 WARNING This furnace is not approved for installation in mobile homes Installation...

Page 8: ...Aconfinedspaceisanareawithvolumelessthan50cubic feet per 1 000 Btuh of the combined input rates of all WARNING Do not place combustible material on or against the furnace cabinet or within 6 inches of...

Page 9: ...protected to avoid physical damage by vehicles WARNING Donotplacecombustiblematerialonoragainst the furnace cabinet or within 6 inches of the vent pipe Do not place combustible materials including gas...

Page 10: ...or Type Standard Single Wall Metal Vent Type B 1 Double Wall Metal Vent LEFT SIDE 0 0 RIGHT SIDE 5 0 VENT 6 1 BACK 0 0 BOTTOM 0 0 TOP 1 1 FRONT 4 4 UPFLOW DOWNFLOW INSTALLATION CLEARANCES LEFT SIDE RI...

Page 11: ...alled directly on combustible wood flooring or supports if type B 1 vent pipe is used See Figure 4 It is recommended for further reduction of fire hazardthatcementboardorsheetmetalbeplacedbetween the...

Page 12: ...0 000 100 000 120 000 140 000 160 000 Minimum Free Area Each Opening 10 sq in 15 sq in 20 sq in 25 sq in 30 sq in 35 sq in 40 sq in Round Duct Diameter 4 5 5 6 6 7 8 Furnace Water Heater Vent or Chimn...

Page 13: ...a chimney serving a fireplace the fireplace must be sealed off from the chimney For Category I furnace installations the furnace shall be connectedtoafactorybuiltchimneyorventcomplyingwith a recognize...

Page 14: ...burner operation Use the flame of a match or candle 8 If improper venting is observed during any of the above tests the venting system must be corrected in accordance with the NationalFuelGasCode ANSI...

Page 15: ...thends of the bleed tube Do not cover the hole in the bleed tube Place the assembly back on the pressure switch sensor tube and the collector pan sensor tube See Figure 12 2 Remove the nut and restric...

Page 16: ...pipes and fittings or using support straps All jointsmustbesealedwithhightemperaturesiliconebefore locking bands are installed If the lengths of pipe must be cut the joint must still be sealed with si...

Page 17: ...nsareprovidedwiththekit Installation must conform to those instructions and applicable requirements of local codes WARNING The entire vent system must be sealed with a high temperature sealant which w...

Page 18: ...100 00 Btuh 30 kW 36 inches 91 cm for appliances 100 00 Btuh 30 kW 4 feet 1 2 m below or to side of opening 1 foot 300 mm above opening C Clearance to permanently closed window D Vertical clearance t...

Page 19: ...alf Inner Shield 41 2 Dia Wall Thimble Outer Half Outer Overlapping Shield 61 2 Dia 3 Termination Tee Protective Screen Inside Combustible Wall Inside Combustible Wall 3 Vent Pipe Outside Combustible...

Page 20: ...e casing to avoid unwanted noise and or damage to the furnace All gas piping must be installed in compliance with local codes and utility regulations Some local regulations requiretheinstallationofama...

Page 21: ...80 170 1 1 4 1050 730 590 500 440 400 370 350 1 1 2 1600 1100 890 760 670 610 560 530 The cubic feet per hour listed in the table above must be greater than the cubic feet per hour of gas flow require...

Page 22: ...ane sea level and high altitude is detailed in the installation instructions provided with the conversion kit Approved conversion kits are listed below UnitedStatesLP PropaneGasSeaLevelandHighAltitude...

Page 23: ...ors can cause improper and dangerous operation Verify proper operation after servicing Thefurnacecabinetmusthaveanuninterrupted unbroken groundtominimizeinjuryshouldanelectricalfaultcondition occur Th...

Page 24: ...rounded 2 The thermostat wires R W Y and G are securely connected to the correct leads on the terminal strip of the circuit board 3 The gas line service pressure does not exceed 10 0 in watercolumn 0...

Page 25: ...the manifold pressure remove the regulator cap and turn the adjusting screw clockwise to increase pressure or counter clockwise to reduce pressure Replace the regulator cap after adjustments are compl...

Page 26: ...airflows for other modes of operation exceptgasheat aredeterminedbythissetting Table1showstheairflowvaluesversustheairflowselector switch settings and the range of airflow settings recom mended for e...

Page 27: ...furnace door is in place and that there is power to the furnace Set the thermostat to a temperature above room temperatureandobservetheignitionsequence Theburner flame should carry over immediately b...

Page 28: ...ame Sensor The flame sensor acts to prove that flame has carried over from the igniter to the opposite end burner If no flame is sensed the furnace will shut down within 7 seconds of ignition Flame Ro...

Page 29: ...season Newornewly renovatedhomesmayrequiremorefrequentchanginguntil the construction dust has been removed Filters for side return and bottom return applications are available from your local distribu...

Page 30: ...WHITE STRIPES WHITE NEUTRAL BLACK 120V GROUND BLACK BLUE FLAME ROLL OUT SWITCH ALL MODELS PRESSURE SWITCH C 180 120 90 60 THERMOSTAT R Y G W YELLOW GREEN BLUE GREY RED YELLOW BLACK WHITE BLACK W W RED...

Page 31: ...FF position 5 Disconnect the wires from the gas valve igniter flame sensor combustion air motor flame roll out switch blocked vent switch over temperature limit switch pressure switch CAUTION Label al...

Page 32: ...ctions leak tested ________ Gas Line Pressure _________ in water column with furnace operating Manifold Pressure _________ in water column with furnace operating Is there adequate fresh air supply for...

Reviews: