background image

Color Change Tasks:  Cyclone Side Operator 

q.

Lance assemblies 

not

 equipped with hose manifolds: 

i. When the internal gun purge is done, raise the lances 

all the way.  

ii. Blow off the bottom of the lances and up into the lance 

ports. 

r.

Blow off the lances, powder hoses, air tubing, sieve 
bracket, vibratory table and purge manifold, and inside 
ceiling, walls, and floor of the feed center. 

 

s.

Turn the purge switch to the PUMP position. 

3.

Move to the cyclone 

       Transfer pan must be cleaned while pump purge is cycling 

a.

Open the transfer pan and blow it clean while the bulk 
feed and reclaim pumps are purging.  

b.

Blow clean the bottom flange of the cyclone. 

  

c.

Lock the transfer pan in the open position. 

4.

Move to the feed center 

a.

Assemble the sieve with the pan chute pointing toward the 
lances. 

b.

Load a feed hopper or powder box onto the table. 

c.

Turn the powder source switch to hopper or box. 

d.

Connect the fluidizing tubing to the hopper (if used). 

5.

Move to the cyclone 

a.

Riser cleaning must be completed and riser door closed 
before cyclone can be opened 

b.

Release the latches and swing the lower section into the 
cleaning position. 

c.

Open the cleaning duct slide gate. 

6.

Move to the feed center 

a.

Turn the purge switch OFF. 

b.

Turn the reclaim and bulk feed pumps OFF. 

c.

Turn the color change switch OFF. 

d.

Lower the lance into the new powder. 

e.

Connect the bulk transfer hose to the sieve. 

f.

If not spraying to waste before production, connect the 
reclaim transfer hose to the sieve. 

g.

At the bulk feed system, insert the pump siphon hose into 
the new powder. 

h.

Turn ON the sieve. 

i.

Turn ON the vibratory table, if used. 

j.

Turn ON the reclaim and bulk feed pumps. 

7.

Move to the non-cyclone side operator platform 

a.

Connect the powder hose to the spray gun. 

8.

Move to the cyclone side operator platform 

a.

Connect the powder hose to the spray gun and 
start spraying the new powder. 

9.

If spraying to waste before production:  

a.

Spray until confident all old powder is out of 
the system.  

b.

Move to the feed center, turn OFF the reclaim 
pump and sieve. 

c.

Connect the reclaim hose to the sieve. 

d.

Turn ON the sieve and reclaim pump. 