background image

Color Change Tasks:  Non-Cyclone Side Operator 

h.

Set the AeroDecks in the operating position 
and exit the booth.  

i.

Close and latch the exit door. 

7.

Move to the cyclone 

a.

Blow off the lower section of the cyclone. Start 
at the flange and blow toward the bottom with 
a circular/spiral motion. 

b.

Blow off the bottom flange and interior of the 
cyclone using a circular/spiral motion. Break 
air vortex in cyclone by using linear side-to-
side and front-to-back motion inside cyclone. 

c.

Swing the lower section of the cyclone down 
and latch it closed. 

d.

Swing the transfer pan down and latch it 
closed. 

e.

Close the cleaning duct slide gate. 

f.

Open the booth doors at the entry end of the 
booth (if not already opened). 

g.

Start spraying new powder. 

8.

If spraying to waste 

a.

Spray until confident that all old powder is out of the system. 

b.

Do not start production until the cyclone side operator has connected the reclaim hose to the sieve. 

4 of 4 

© 2015 Nordson Corporation.  All Rights Reserved 

1605545-03 

ColorMax, Encore, Prodigy, Sure Coat, Nordson, and the Nordson logo are registered trademarks of Nordson Corporation.  

AeroDeck is a trademark of Nordson Corporation. 

Nordson Corporation  

 Amherst, Ohio  USA 

Issued 06/15 

Reviews: