11
b.
Position the reinforcement bracket immediately above
the fixing point of the two sections of the structure and fix
with a total of 8 screws (2 per corner).
Fix the second reinforcement bracket, if supplied
,
in a
position midway between the first reinforcement bracket
and the upper side of the trellis and fix with 8 screws (2
per corner).
Note:
check that there is no obstacle to an easy fixing of
the discharge tube (aspiration version) or the deflector
(filtering version) in positioning the reinforcement
bracket(s).
3.
Hook the hood to the trellis and make sure that it is
perfectly hooked up. Screw the 16 screws up (4 per
corner) tightly to hook the hood to the trellis.
4.
Apply the perforation diagram of the cooking top to the
ceiling vertically (the centre of the diagram must
correspond to the centre of the cooking top and the sides
must be parallel to the sides of the cooking top – the side
of the diagram with the word FRONT corresponds to the
control panel side). Prepare the electrical connection.
5.
Make holes as indicated (6 holes for 6 wall dowels – 4
dowels for hooking), and screw 4 screws into the external
holes, leaving a space of about 1 cm between the head
of the screws and the ceiling.
6.
Hook the trellis to the ceiling with 4 screws, see operation
4).
7.
Screw the 4 screws up tightly.
8.
Introduce and screw another 2 screws tightly into the
holes for fixing the safety elements remaining free.
9.
Introduce a discharge tube inside the trellis and connect to
the connecting ring of the motor space (discharge tube
and bands not supplied). The discharge tube must be
long enough to reach the exterior (aspiration version) or
the deflector (filtering version).
10. Only for filtering version:
mount deflector
F
onto the
trellis and fix it with 4 screws to the apposite bracket and
finally connect the discharge tube to the connection ring
placed on the deflector.
11.
Connect the electricity to the domestic power. Power
must be supplied only after the installation has been
completed.
12.
Put the nuts equipped with fixing hooks inside the
sections of the upper and lower flues in correspondence
with the rectangular slots. A total of 14 nuts should be
mounted.
13.
Couple the two upper sections of the flue to cover the
trellis so that one of the slits present on the sections is
placed on the same side of the command panel and the
other on the opposite side.
Screw the two sections up with 8 screws (4 per side –
also see the plan diagram for coupling the two sections).
14.
Fix the upper flue set
to the trellis near the ceiling with
two screws (one per side).
15.
Couple the two lower sections of the flue to cover the
trellis using 6 screws (3 per side - also see the plan
diagram for coupling the two sections).
16.
Insert the lower section of the flue into the apposite
housing to cover the motor space and the electrical
connection box completely and fix with two screws from
inside the hood.
17.
Apply the 2 tabs (supplied) to cover the fixing points of
the sections of the lower flue (ATTENTION! THE TABS
FOR THE LOWER FLUE ARE RECOGNISABLE
BECAUSE THEY ARE NARROWER AND LESS DEEP).
The larger and deeper tabs are those to use for the upper
flue and are to be cut to measure.
18.
Supply
the electrical power again acting on the central
electrical panel and check the correct functioning of the
hood.
Installation wall model
When the vapour catcher is disassembled, it must be fixed as
shown in
Fig. a,b
.
The electric connection box must be assembled as shown in
Fig. c,d,e
.
Fig. 9
1.
Drawing a line on the wall with a pencil up to the ceiling,
corresponding to the centre line, will make the installation
operations easier.
2.
Apply the perforation diagram to the wall: the vertical
centre line printed on the perforation diagram should
correspond to the centre line drawn on the wall. In
addition, the lower edge of the perforation diagram
corresponds to the lower edge of the hood.
3.
Make holes as indicated on the template, insert the wall
dowels and screw 2 screws into the upper holes, leaving
a space of about 1 cm between the head of the screw
and the wall.
Note:
Always make the holes indicated on the template.
The upper 2 are for hooking the hood up while the lower
holes (generally 1 central or more lateral) are for the
definitive and safety fixing.
4.
Apply flues support bracket
„G“
to the wall touching the
ceiling. Use the flues support bracket as a perforation
diagram (the small slot in the support must coincide with
the line previously drawn on the wall, if present), and
mark two holes with a pencil. Make the holes and insert 2
dowels.
5.
Fix the flues support bracket to the wall with 2 screws.
6.
Hang the hood to the two upper screws (see installation
phase
3
).
7.
Introduce and screw the screws (and washer(s)) up into
the hole(s) for the definitive fixing (
COMPULSORY!!
).
Then, having checked the setting of the hood, TIGHTEN
ALL THE upper and lower SCREWS.
Note:
the lower fixing points are visible removing the fats
filters and they are at the sides and/or at the centre of the
hood (after having removed the frame of the carbon filter,
if present, in the latter case).
In any case, we recommend using the lateral holes, when
available, to increase the stability of the hood.
Summary of Contents for CHBD603IX
Page 1: ...EN Instruction on mounting and use DE Montage und Gebrauchsanweisung ...
Page 2: ...2 ...
Page 3: ...3 ...
Page 4: ...4 ...
Page 5: ...5 ...
Page 6: ...6 ...
Page 7: ...7 ...
Page 8: ...8 ...
Page 19: ......
Page 20: ...LIB0099994 Ed 04 14 ...