background image

 

Product Overview 

 

 

A. Decoration Cover        B .Heater Head 
C. Heating lamp                D. Switch Box 
E.Top tube                            F. Middle tube 
G.Bottom tube                    H. Base   
I. Power Cable   

 

Warning: Please tear off all the hyaline protect 
film around the

 big Decoration Cover

 first! 

 

 

Assembling Process   

Step 1:   Connect the bottom tube with base by screwing them 

together. 

             

 

 

Step 2: Feed the Power Cord through the Base and the Bottom tube, 

and pull through around 2m of cable. 

 

                         

 

Step 3: Connect the base tube, middle tube and bottom tube by screwing 

Summary of Contents for ZHQ1821SH-BC-B

Page 1: ...ents left in the box and that the heater head is free from any packing material Using the detailed drawing follow the steps to assemble your halogen heater Do not connect the halogen heater to the electrical supply until all the assembly is complete Do not connect the halogen heater to the electrical supply if any of the components or the power cord is damaged in any way If in doubt contact your s...

Page 2: ... than 8 years shall not plug in regulate and clean the appliance or perform user maintenance CAUTION Some parts of this product can become very hot and cause burns Particular attention has to be given where children and vulnerable people are present If the supply cord is damaged it must be replaced by the manufacturer its service agent or similarly qualified person in order to avoid a hazard The h...

Page 3: ...ning Please tear off all the hyaline protect film around the big Decoration Cover first Assembling Process Step 1 Connect the bottom tube with base by screwing them together Step 2 Feed the Power Cord through the Base and the Bottom tube and pull through around 2m of cable Step 3 Connect the base tube middle tube and bottom tube by screwing ...

Page 4: ...base bottom tube middle tube and top tube Connect the power cord plug to the socket in the heater head Step 5 Push the Heater Head onto the Top tube and fix in position using 2 pcs φ4 8mm screws Step 6 Fix the Power Cord on the Base by using 4pcs M4 Screws ...

Page 5: ...where all the feet on the base are in contact with the floor Should the heater be tilted or fall over the auto cut off switch will activate 1 Site the heater outside or in a large open area and well away from any obstructions such as branches or where the heater is near any objects that can be effected by heat such as furniture curtains or other inflammable objects minimum distance 1 ...

Page 6: ...ter has been installed It shall not be placed on the back of portable heaters 12 The unit must be placed with the clearance of 100cm to the wall and 30cm to the ceiling 13 The unit must be correctly installed according to the instructions Make sure the head is at least 1 8m from the floor 14 The unit must be securely placed on a horizontal and flat surface 15 The unit is at high temperature during...

Page 7: ...se this heater in small rooms when they are occupied by persons not capable of leaving the room on their own unless constant supervision is provided 33 Don t use this unit in place of animal propagating and raising 34 Don t immerse this unit into water for cleaning 35 The unit should be plugged in a socket which is easily visible and reachable 36 Two Dark points may exist on the surface of the hea...

Page 8: ... replacing the halogen tube should only be carried out by a qualified electrician or by a recommended service center STORAGE If the heater will not be used for a long period of time store it in a cool dry location when not in use To prevent dust and dirt build up use the original packaging to repack the unit TROUBLE SHOOTING If the heater will not operate please check the following before seeking ...

Reviews: