This sheet must be completed by the commissioning engineer after the heater has been started for the
first time.
TO BE RETURNED TO NORDAIR NICHE
CUSTOMER
HEATER TYPE
SERIAL No
BMS CONTROLLER TYPE
HEATER ADDRESS
MOTOR
MOTOR PULLEY
FAN PULLEY
BELTS
BELT CENTRES
ALIGNMENT
TENSION
PROFILE OPENING
VELOCITY
BURNER SIZE
CURRENT
L
1
L
2
L
3
OVERLOAD SIZE
GAS LINE SUCTION
LOW FIRE
HIGH FIRE (DIFF)
GOVERNOR INLET PRESS
GOVERNOR OUTLET PRESS
PILOT PRESSURE
AIR PRESS DIF
AIR PRESS SWITCH SET @
OVERHEAT SET@
CHECKS
FULL SYSTEM CHECK
LOCKOUT FLAME FAILURE
LOCKOUT AIR FAILURE
GAS TRAIN SOUNDNESS
GAS VALVE POSITION
OVERHEAT STAT
GAS VALVE MODULATION
Engineer.......................................................................
Date....................................
Commissioning setting fresh air heaters