![NorAire NC-FE series Installation & Operating Instructions Manual Download Page 16](http://html1.mh-extra.com/html/noraire/nc-fe-series/nc-fe-series_installation-and-operating-instructions-manual_1700488016.webp)
05/16/2014 14
NI216
Mechanical Installation – Outdoor Unit (ODU)
Consult and use details within the ODU manufacturer’s supplied installation manual. The refrigerant to water
heat exchanger within this IDU is essentially the same as the refrigerant to air coil within the ODU
manufacturer’s specified A-coil (dual fuel) or matched air handler.
Since this is a heat pump (winter use) it needs to be installed off the ground, on a stand or blocks with at least 8”
to 12” ice build-up space under the unit.
This IDU includes an adjustable TXV expansion, common with air coils. This IDU only has a nitrogen charge.
The ODU has extra charge volume for line set and this IDU internal heat exchanger (coax).
See ODU installation manual for special line set slope conditions or oil trap if the elevation between the ODU
and the IDU at a certain height.
This ODU requires a
field
added filter/dryer; however, there are some ODU’s which have the filter/dryer
internally installed, in this case do not use a loose filter/dryer. Add in the liquid line preferably at this IDU.
Line set
– use ODU manufacturer’s requirements for line set. However, since the IDU coax heat exchanger has
a smaller charge volume than the typical forced air A-coil matched with this ODU, this IDU includes a
refrigerant
liquid receiver
. There probably is no need to calculate extra charge for extra line set length because
the IDU receiver will have as much as 16 oz. additional charge available.
Note:
There is a concern for possible ODU overcharge, the IDU receiver may not take up the full ODU
extra charger. Thus, it is very important during the power-up checks and adjustments to make sure the
sub-cool/superheat is within tolerance shown within the ODU provided Operating Conditions chart or
ODU nameplate chart.
Evacuate and leak check –
as required with all air conditioning or heat pump line set installations, the prudent
and proper vacuum pump down and leak check are required. The ODU manufacturer’s supplied installation
manual details must be followed as well as refrigeration best practices.
Summary of Contents for NC-FE series
Page 22: ...05 16 2014 20 NI216 ...
Page 49: ... 0 1 2 3 4 5 6 3 0 1 40 1 5 3 1 7 8 8 4 5 43 15 ...
Page 50: ... ...
Page 51: ... ...
Page 52: ... ...
Page 53: ... ...
Page 54: ... ...
Page 55: ... 01 2 ...
Page 56: ... 0 0 1 0 2 1 3 4 4 5 0 6 ...
Page 57: ... ...
Page 60: ......
Page 63: ...XX036 ...
Page 64: ...XX036 ...