8
5
Target Installation and Alignment
NOTE: It is very important that the rods be installed on the right hand side of the
sprayer.
1.
Ensure the sprayer chassis and booms are leveled and the center section is approximately 4
feet above the ground. A ladder or step will be required for this part of the installation.
Figure 4: Roll Control Items
Figure 5: Typical Roll Control Install
Bumper
Frame
Target
Roll
Control
Frame
Sprayer Parallel Lift
Frame
Sensor
Bracket
Roll
Sensor
Spring
Target
Boom Centre
Frame
Remove the Rubber
Bumper
Sensor Bracket (B11)
Spring Target (B08)
Frame Target (B07)