
22
11.
Connect the sensor branch cable (
C02
)
to the 4-pin AMP plug on
C01
(
Figure
23
).
12.
Route the sensor branch cable (
C02
) to
the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.
13.
Cable-tie the installed cables every 12
inches.
Provide enough slack in all
cables to account for the
movement of the main section,
parallel lift, and FOLDING
boom movement.
Figure 23 – Cable Configurations: C01
and C02
14.
Screw the cover plates (
B17
and
B18
)
onto the access plate (
B16
) to seal the
cab.
4.8
C
OMPLETING THE
I
NSTALLATION
1.
Start up your sprayer and test the
sprayer’s functionality. The NORAC
Control Panel does not need to be
powered up for the original switches to
function. Unfold the booms and
raise/lower each boom and main
section.
Confirm that the cabling/hoses
are agreeable to the entire
range of motion.
2.
If any functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation.
If you still have trouble, contact
NORAC for assistance.
3.
Turn on the power for the UC4+
Control Panel using the switch on the
side of its chassis.
4.
Repeat the Boom Speed Test as
described in Section
4.2
Boom Speed
Test
with the NORAC UC4+ Spray
Height Control system installed.
Record the results for comparison in
Table 5
.
5.
The procedure for the installation of the
UC4+ Spray Height Control system is
now complete. Begin the AUTOMATIC
SYSTEM SETUP procedure as described
in the
UC4+ Spray Height Control
Operator’s Manual
(
M01
).