19
4.6.3 Hydraulic Plumbing
WARNING!
From this point in the installation the booms
will be inoperative until the electronics are
fully installed.
You must also ensure there are no
other orifices present in the circuit
between the NORAC valve block and
the boom cylinders.
1.
After the NORAC valves are mounted, the
hydraulic hoses and fittings can be plumbed.
The plumbing for the hydraulic circuit is
shown schematically in
Figure 3.
2.
Disconnect the existing “raise” lines from the
valve block. Install the 6FJCN fittings (
F03
)
to the disconnected ports of the valve block.
3.
Connect the “raise” lines to the “B” ports
leading from the NORAC valve block.
4.
Disconnect the accumulators from the “T”
fittings on the Left and Right Tilt boom
cylinders. Remove the fittings attached to the
accumulators.
5.
Between the accumulators and the “T”
fittings on the cylinders, insert the 8MB-8MJ
with orifice adapters (
F08
), 8FJX unions
(
F04
) (
Figure 23
).
6.
Tee the pressure (
H04
) and tank (
H03
) lines
for the NORAC block in to the existing lines
from the existing valve block, using the “T”
fitting (
F02
).
Figure 23 – Accumulator fittings
Summary of Contents for UC4+ 1200/1600
Page 9: ...6 Figure 3 Hydraulic Components ...
Page 14: ...11 Figure 9 Sensor Serial Number Installation Location 3 SENSOR SYSTEM 5 SENSOR SYSTEM ...
Page 28: ...25 5 3 ITEM C03 44656 VALVE CABLE VARIABLE RATE ...
Page 29: ...26 5 4 ITEM C10 44650 35 POWER CABLE GENERIC PULL TYPE ...
Page 30: ...27 5 5 ITEM C11 44651 03 EXTENSION CABLE VALVE GENERIC ...
Page 31: ...28 5 6 ITEM C12 44658 38 ALL INTERFACE CABLE ...
Page 32: ...29 5 7 ITEM C16 44658 39 BYPASS INTERFACE CABLE ...