25
4.8 C
OMPLETING THE
I
NSTALLATION
1.
Start up your sprayer and test the
sprayer’s functionality. The NORAC
Control Panel does not need to be
powered up for the original switches to
function. Unfold the booms and
raise/lower each boom and main section.
Confirm that the cabling and hoses
are agreeable to the entire range of
motion.
2.
If any functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation.
If you still have trouble, contact
NORAC for assistance.
3.
Turn on the power for the UC4+ Control
Panel using the switch on the side of its
chassis.
4.
Repeat the Boom Speed Test as
described in Section
4.2
Boom Speed
Test
with the NORAC UC4+ System
installed. Record the results for
comparison in
Table 5.
5.
For optimal performance of the UC4
system, there should be very little play at
the hitch clevis. The addition of
polymer washers can help tighten up this
connection (
Figure 28
).
Figure 28 – Hitch Point
6.
The procedure for the installation of the
UC4+ System is now complete. Begin
the AUTOMATIC SYSTEM SETUP
procedure as described in the
UC4+
Sprayer Boom Control Operator’s
Manual
(
M01
).
Summary of Contents for FLEXI-COIL 67 Series
Page 10: ...7 Figure 3 Hydraulic Plumbing Schematic ...
Page 15: ...12 Figure 9 Sensor Serial Number Installation Location 3 SENSOR SYSTEM 5 SENSOR SYSTEM ...
Page 30: ...5 3 ITEM C02 44668 SENSOR BRANCH CABLE 5 4 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL ...
Page 31: ...5 5 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT 5 6 ITEM C04 44651 VALVE EXTENSION CABLE ...
Page 32: ...5 7 ITEM C10 44650 09 POWER CABLE FOR FLEXI COIL 67 SERIES ...